My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-032/Water Reuse Asset Management Plan
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-032/Water Reuse Asset Management Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2016 10:44:26 AM
Creation date
3/28/2016 8:46:09 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-32
Date
3/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of San Marcos <br />Water Reuse System <br />Asset Management Plan <br />LOF and COF components were selected by San Marcos staff in a workshop held on February <br />17, 2016, to form a risk matrix specifically for San Marcos reuse system. Table 5.1 shows a <br />summary of the LOF and COF risk matrix components chosen for the reuse system facility <br />assets and Table 5.2 provides the LOF and COF components for the reuse pipeline assets. <br />The staff also determined the specific weights that should be applied to each component in the <br />overall risk analysis. Detailed scoring tables defining the source of data and methodology were <br />then developed for input into the APAI Risk Model. <br />City of San Marcos <br />Asset Management Plan <br />Risk Assessment - Reuse Water Assets <br />LIKELIHOOD OF FAILURE COMPONENTS <br />100 <br />Comnonent Weiaht <br />1 <br />Staff opinion of condition <br />15 <br />2 <br />Reactive Repair History (Work orders / <br />ear <br />15 <br />3 <br />Age (yr) <br />15 <br />4 <br />Duty (hrs /day or year) <br />15 <br />5 <br />Maintenance Requirements (WO) <br />15 <br />6 <br />Redundancy <br />25 <br />I CONSEQUENCE OF FAILURE COMPONENTS II <br />1 100 II <br />Comnonent Weia <br />1 <br />Utility employees health and safety <br />35 <br />2 <br />Utility - Loss of revenue <br />20 <br />3 <br />Utility - Repair cost <br />20 <br />4 <br />Effluent quality <br />25 <br />Table 5.1 - San Marcos Reuse System Facility Assets Relative Risk Matrix <br />February 2016 Page 25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.