My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01241994 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
1990 s
>
1994
>
01241994 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2008 1:52:41 PM
Creation date
12/1/2003 12:50:39 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Regular Meeting
Date
1/24/1994
Volume Book
114
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ì1"" <br /> .- 3Q¡V <br /> _. <br /> SAN MARCOS ACTIVITY CENTER <br /> San Marcos, Texas Page 1 of 2 <br /> Beaty Saunders Architects, Inc. <br /> PROJECT DESCRIPTION <br /> Project Location: 40 miles from San Antonio, Texas <br /> ..~ <br /> General Project Description: Municipal Sports and Recreation Center <br /> Total Area of Building: 54,158 SF Ground Floor Area: 54,158 SF <br /> Number of Floors: 1 Floor to Ceiling Height: 22.0 Ft. <br /> Average Height from Grade to First Floor Level: 2 Feet <br /> Average Parapet Height (Roof Top to Top of Exterior Wall): 4 Feet <br /> Average Building Perimeter: 1,163 Feet <br /> O\'mer Type: Governmental - Construction Quality: Very Good <br /> . <br /> Given Site Area: Unspecified <br /> Required Site Area: 4.028 acres = 175,480 Square Feet <br /> Topographic Characteristic of Site: Gentle Slope <br /> Special Building Features: Cost <br /> Indoor Swimming Pool $294,800 <br /> Fire Sprinkler System $59,620 <br /> Commercial Kitchen $60,000 <br /> , <br /> Site and Special Outside Work: Area (Sq. Ft.) Cost <br /> 160 site parking spaces 60,000 $91,218 <br /> Landscape allowance 26,322 $75,000 <br /> Entry Plaza 20,000 $75,000 <br /> WalkwaylLow Walls 10,000 $35,000 <br /> Clock Tower 0 $40,000 <br /> Natatorium Courtyard/Fence 5,000 $37,000 <br /> Time Schedule: <br /> 09/01/94 Bid date <br /> 1 % 1/94 Ground breaking <br /> 08/01/95 Move in date ( 10 Months construction time) <br /> Note: Dates are based on timely commencement of design work, and normal weather during <br /> construction with no strikes or other delaying problems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.