Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Eventually, the Paso Robles development, the McCarty Lower Pressure Plane, and the <br />Oakridge/Deerwood areas will all be combined with the Upper Pressure Plane at an overflow of <br />936 feet. In 2020, however, most of the system will operate as it does currently, with all seven <br />existing major pressure planes still operating as they do now. A new hydropneumatic tank will <br />be added at the Soyars Tank and the Soyars Pump Station will serve the Paso Robles <br />Development on an interim basis with the hydropneumatic tank. One other change will take <br />cos and Crystal Clear Water <br />Supply Company (CCWSC) will trade portions of the CCN boundary along the southern side of <br />the City. Namely, the City will give CCWSC control over the Grandview Drive and Crest Circle <br />Drive neighborhoods, which has high water age and is challenging for the City to serve. <br />Quite a few water line projects will be needed to serve the new developments proposed for <br />2020. They are described as follows: <br /> near Soyars tank. <br /> <br />the 936 Plane. <br /> CIP 7: Complete 24" main by joining end of line at McCarty Rd. to IH-35 just north of <br />Premium Outlets. <br /> nd of Stagecoach to intersection of Belvin and Bishop to tie <br />-end line. <br /> CIP 9: Upsize existing lines with 16" main along E. McCarty Ln. just north of Old <br />Bastrop. <br /> between <br /> <br /> CIP 11: Construct Phase I of Paso Robles, which includes a 24 home subdivision behind <br />the Soyars Facility. <br /> <br />serve new growth areas. <br /> <br /> <br />Plane) in Hunter Rd to a 12" in Industrial Fork Rd.) <br /> -35 to the Civic Center Loop. <br /> CIP 16: Upgrade 8 existing water line crossings to 16" Between McCarty & Aquarena <br />Springs Rd. <br /> <br />Appendix B contains additional figures showing minimum pressure nodes and fire flow <br />availability results for the 2020 system. <br />Figure 6-1 depicts the proposed 2020 system, with all pressure planes identified. Appendix B <br />contains additional figures showing minimum pressure nodes and fire flow availability results for <br />the 2020 system. <br /> <br />6-2 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />