My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2016 10:22:57 AM
Creation date
10/17/2016 9:06:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-137
Date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />List of Figures <br />Figure 2-1: Map of Existing Potable Water System ................................................................. 2-2 <br />Figure 3-1: Cottonwood EST Calibration (April 911, 2014) .................................................... 3-3 <br />Figure 3-2: SWTP Pump Station Discharge Calibration (April 911, 2014) ............................. 3-3 <br />Figure 3-3: Old Bastrop Road Permanent Pressure Station Calibration (April 9-11, 2014) ...... 3-4 <br />Figure 3-4: Prospect PRV Downstream Pressure Calibration (April 9-11, 2014) ..................... 3-4 <br />Figure 4-1: Projected Growth Areas ........................................................................................ 4-3 <br />Figure 6-1: 2020 Distribution System with Recommended CIPs ............................................. 6-3 <br />Figure 6-2: 2025 Distribution System ...................................................................................... 6-6 <br />Figure 6-3: 2035 Distribution System ...................................................................................... 6-8 <br />Figure 7-1: 2013 System Water Age ....................................................................................... 7-2 <br />Figure 7-2: 2020 System Water Age ....................................................................................... 7-4 <br />Figure 7-3: 2025 System Water Age ....................................................................................... 7-6 <br />Figure 7-4: 2035 System Water Age ....................................................................................... 7-8 <br />Figure 8-1: Map of Capital Improvement Projects 2020, 2025, and 2035 ............................. 8-8 <br /> <br />List of Tables <br />Table 2-1: Existing Operational Pressure Planes .................................................................... 2-3 <br />Table 2-2: Water Supply Summary ......................................................................................... 2-5 <br />Table 2-3: Existing Storage Facilities Summary ...................................................................... 2-6 <br />Table 2-4: Proposed Storage Facilities Summary ................................................................... 2-8 <br />Table 2-5: Existing Pumping Facilities Summary ................................................................... 2-10 <br />Table 2-6: Proposed Pumping Facilities Summary ................................................................ 2-11 <br />Table 4-1: Water Population Projections ................................................................................. 4-1 <br />Table 4-2: 2014 Conservation Plan GPCD Targets ................................................................. 4-2 <br />Table 4-3: Projected Water Demands ..................................................................................... 4-2 <br />Table 4-4: Diurnal Curve Patterns Developed from AMI Data ................................................. 4-4 <br />Table 8-1: 2020 CIP List Pipeline and Pump Station Projects .............................................. 8-2 <br />Table 8-2: 2025 CIP List Pipeline and Pump Station Projects .............................................. 8-4 <br />Table 8-3: 2035 CIP List Pipeline and Pump Station Projects .............................................. 8-6 <br />Table 8-4: Impact Fee Eligible Projects ................................................................................... 8-9 <br /> <br />List of Appendices <br />Appendix A <br /> Existing System Hydraulic Model Development and Calibration Technical <br /> Memorandum (November 2014) <br />Appendix B <br /> 2020 System Hydraulic Model Results <br />Appendix C <br /> 2025 System Hydraulic Model Results <br />Appendix D <br /> 2035 System Hydraulic Model Results <br />Appendix E <br /> Water Age Model Results <br />Appendix F <br /> CIP List Opinion of Probable Construction Cost <br />Appendix G <br /> Evaluation of Service Unit Equivalency Technical Memorandum (April 2016) <br />ii <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.