Laserfiche WebLink
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Table 8-1: 2020 CIP List Pipeline and Pump Station Projects <br />CIP # Description Flow Rate or Volume Units TOTAL <br />New Pumps at Comanche to fill RR12 & 50 <br />1 1250 GPM 4 $176,000 <br />LF 16" yard piping <br />New 0.5 MG Elevated Storage for 1063' <br />2a 0.5 MG 1 $1,347,000 <br />Plane (La Cima EST) <br />720 GPM 2 <br />2b New Pumps at RR12 to fill La Cima Tank $2,619,000 <br />1380 GPM 2 <br />3 600 GPM 2 $62,000 <br />Pressure Plane (2020) and Trunk Hill in 2025. <br />2020 CIP Pump Station/Tank Total <br />$4,204,000 <br /> <br />Diameter <br />CIP # Description Length (LF) TOTAL <br />(in) <br />Connect Soyars Tank to 810 Plane and <br />4 16 1300 $266,000 <br />temporarily convert Hunter Rd. to 936 Plane <br />Close gap between existing 16" in Hunter and <br />5 16 2800 $567,000 <br />Soyars tanks <br />Hunter Road from Quail Run to Centerpoint <br />6 12 5300 $687,000 <br />(near Soyars) Extension in 936 Plane <br />Complete 24" main by joining end of line at <br />7 24 6000 $2,240,000 <br />McCarty Rd to IH-35 just north of Tanger Outlets <br />Extend line from end of Stagecoach to <br />8 intersection of Belvin and Bishop (existing 12" tie 12 3800 $504,000 <br />in). <br />Upsize existing 12" main to 16" main along E. <br />9 16 2100 $401,000 <br />McCarty Ln. just north of Old Bastrop Hwy. <br />Upsize 12" between existing 24" and 18" in SH <br />10 24 4100 $1,531,000 <br />123 to 24" <br />16 1700 $248,000 <br />Initial portion of Paso Robles Loop to Phase I of <br />11 <br />Development (24 homes) <br />24 400 $103,000 <br />TX 123 to E. McCarty Lane along Old Bastrop <br />12 16 5000 $925,000 <br />Highway <br />13 Upsize small diameter lines to 12" 12 4500 $641,000 <br />Connect existing 12" (on 810 plane) in Hunter Rd <br />14 12 3900 $505,000 <br />to 12" in Industrial Fork Rd <br />Upsize 8" lines along IH-35 frontage road & <br />15 12 6800 $1,227,000 <br />provide connection to loop at Leah Ave. <br />Upgrade 8 existing IH-35 water line crossings to <br />16 16 3200 $1,887,000 <br />16" Between McCarty & Aquarena Springs Rd. <br />17 Extend northeast along Airport Rd 12 9000 $1,038,000 <br />Upsize lines to 8" PVC that serve & connect <br />41B 8 5100 $385,000 <br />Briarwood Drive neighborhood to system. <br /> <br />8-2 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />