Laserfiche WebLink
EXHIBIT A <br />FACILITY <br />SCHEDULE <br />NO. <br />LOCATION OF <br />POINT(S) OF <br />INTERCONNECTION <br />(# of Points) <br />INTERCONNECTION <br />VOLTAGE (kV) <br />EFFECTIVE DATE <br />OF <br />INTERCONNECTION <br />1 <br />Hilltop Substation (2) <br />138 kV <br />Date of restated <br />agreement <br />2 <br />Strahan Substation (1) <br />12.5 kV <br />April 18, 2013 <br />3 <br />McCarty Lane Substation <br />(6) <br />12.5 kV <br />May 26, 2009 <br />4 <br />Ranch Road 12 Substation <br />(1) <br />138 W <br />Date of restated <br />agreement <br />5 <br />Redwood Substation (12) <br />2 @ 138kV; 10 @ <br />12.5kV <br />May 26, 2009 <br />6 <br />San Marcos Substation (4) <br />138 kV <br />Sept 26, 2014 <br />7 <br />Canyon Substation (4) <br />12.51cV <br />May 26, 2009 <br />LCRA TSC — San Marcos Electric Utility Page 15 of 39 <br />