• Two (2) 138 kV dead-end towers with associated main bus and insulators <br />• 12.5 kV bus potential transformers <br />• Underfrequency relay panel <br />• 12.5 kV metering current transformers CT -1, CT -3, CT -4 <br />10. Operational Responsibilities of Each Party: Each Party will be responsible for the <br />operation of the equipment it owns LCRA TSC shall operate the SMEU 138 kV <br />equipment, including monitoring the SMEU power transformer alarms. <br />11. Maintenance Responsibilities of Each Party: Each Party will be fully responsible for <br />the maintenance of the equipment it owns. <br />12. Other Terms and Conditions <br />• The City and LCRA TSC are to share access to the substation by LCRA TSC <br />locks in the gate and in the control house doors. <br />• SMEU will provide LCRA TSC access to 125 VDC and 120 VAC power. <br />Circuits must have over current protection devices (OCPD) sized according to <br />NEC standards. Panel boards containing the OCPD may belong to either SMEU <br />(if space is available) or LCRA TSC. <br />• SMEU will provide LCRA TSC with floor space (as available and as necessary) <br />in its control houses for the installation of LCRA TSC required relay panel boards <br />and equipment. <br />• LCRA TSC and SMEU shall design, provide, and coordinate their respective <br />protection system equipment so that adjacent zones of protection overlap, in <br />accordance with ERCOT Nodal Operating Guides. <br />LCRA TSC — San Marcos Electric Utility Page 27 of 39 <br />