Laserfiche WebLink
FACILITY SCHEDULE NO. 5 <br />1. Name: Redwood Substation <br />2. Facility Location: The Redwood Substation is located at 1375 Wonder World Drive, <br />San Marcos, Hays County, Texas. <br />3. Points of Interconnection: There are a total of twelve (12) points of interconnection at <br />Redwood Substation generally described as: <br />• where the 138 kV transformer bus connects to Operating Bus #1 for PWT -2. <br />• where the 138 kV transformer bus connects to Operating Bus #2 for PWT -2. <br />• where the incoming distribution line connects to the tubular bus between switches <br />RW -321 and RW -323 at breaker RW -320. <br />• where the jumper from breaker RW -320, passing through CT -15, connects to the <br />4 hole pad on switch RW -319. <br />• where the jumper from breaker RW -320 connects to the 4 hole pad on switch <br />RW -321. <br />• where the incoming distribution line connects to the tubular bus between switches <br />RW -341 and RW -343 at breaker RW -340. <br />• where the jumper from breaker RW -340, passing through CT -11, connects to the <br />4 hole pad on switch RW -339. <br />• where the jumper from breaker RW -340 connects to the 4 hole pad on switch <br />RW -341. <br />• where the jumper from switch RW -202 connects to the 12.5 kV Operating bus for <br />PWT -2, T-2. <br />• where the jumper from switch RW -205 connects to the 12.5 kV Transfer bus for <br />PWT -2, T-2. <br />• where the jumper from switch RW -102 connects to the 12.5 kV Operating bus for <br />PWT -2, T-2. <br />• where the jumper from switch RW -105 connects to the 12.5 kV Transfer bus for <br />PWT -2, T-2. <br />4. Transformation Services Provided by LCRA TSC: Yes for PWT -3, T-3 only, per <br />separate Transformation Service Agreement <br />5. Metering Services Provided by LCRA TSC: Yes, per separate Wholesale Metering <br />Service Agreement <br />6. Delivery Voltage: 138 kV for PWT -2; 12.5 kV for PWT -3 <br />7. Metered Voltage and Location: The metered voltage is 12.5 kV. The metering current <br />transformers are located in each individual bay. The metering potential transformers are <br />located on the 12.5 kV operating buses. <br />LCRA TSC — San Marcos Electric Utility Page 29 of 39 <br />