My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:56:52 PM
Creation date
1/23/2017 1:06:35 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-177
Date
12/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACILITY SCHEDULE NO. 7 <br />1. Name: Canyon Substation <br />2. Facility Location: The Canyon Substation is located at 2349 N. IH 35, San Marcos, <br />Hays County, Texas 78666. <br />3. Points of Interconnection: There are four (4) Points of Interconnection in the Canyon <br />Substation generally described as: <br />• where the jumper from the 12.5 kV operating bus bolts to the four hole pad on <br />switch CA -9 at breaker CA -10. <br />• where the jumper from the 12.5 kV transfer bus bolts to the four hole pad on <br />switch CA -13 at breaker CA -10. <br />• where the jumper from the 12.5 kV operating bus bolts to the four hole pad on <br />switch CA -19 at breaker CA -20. <br />• where the jumper from the 12.5 kV transfer bus bolts to the four hole pad on <br />switch CA -23 at breaker CA -20. <br />4. Transformation Services Provided by LCRA TSC: Yes, per separate Transformation <br />Service Agreement <br />5. Metering Services Provided by LCRA TSC: Yes, per separate Wholesale Metering <br />Service Agreement <br />6. Delivery Voltage: 12.5 kV <br />7. Metered Voltage and Location: The metering voltage is 12.5 kV. The metering current <br />transformer is located inside PWT -1, T-3. The bus potential transformer is located on the <br />12.5 kV operating bus. <br />8. One Line Diagram Attached: Yes <br />9. Description of Facilities Owned by Each Party: <br />SMEU owns: <br />• Three (3) distribution circuits including dead end insulators that attach to the dead <br />end structure, conductors, and hardware <br />• Two (2) distribution circuit breakers CA -10, and CA -20 including jumpers and <br />protective relay packages <br />• Three (3) distribution circuit breaker foundations in bays 1,2 and 3 <br />• Three (3) surge arresters <br />• Nine (9) hook switches <br />LCRA TSC — San Marcos Electric Utility Page 37 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.