My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:56:52 PM
Creation date
1/23/2017 1:06:35 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-177
Date
12/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3.10 Point(s) of Interconnection shall mean the points where the electrical systems of <br />the Parties are connected or may, by the closure of normally open switches, be connected. <br />3.11 PUCT shall mean the Public Utility Commission of Texas or its successor in <br />function. <br />ARTICLE IV — ESTABLISHMENT AND TERMINATION <br />OF POINTS OF INTERCONNECTION <br />4.1 The Parties agree to comply with NERC Reliability Standards as they relate to the <br />interconnection of their facilities at the locations identified and described in the Facility <br />Schedules which are attached hereto and incorporated herein. <br />4.2 The Parties agree to interconnect their facilities at the locations, and in accordance <br />with the terms and conditions, specified in the attached Facility Schedule(s). All Points of <br />Interconnection shall be specified in Exhibit "A" and the Facility Schedule(s) attached hereto <br />and made a part hereof. The Facility Schedule(s) shall specify the responsibilities of the Parties <br />with respect to ownership, control, operation, and maintenance of the interconnection facilities. <br />4.3 Unless otherwise provided in a Facility Schedule, each Party shall, at each Point <br />of Interconnection, at its own risk and expense, design, install, or cause the design and <br />installation of the transmission or distribution facilities (including all apparatus and necessary <br />protective devices) on its side of the Point of Interconnection, so as to reasonably minimize the <br />likelihood of voltage and frequency abnormalities, originating in the system of one Party, from <br />affecting or impairing the system of the other Party, or other systems to which the system of such <br />Party is interconnected. The Parties agree that all Points of Interconnection will be established in <br />conformance with operating guidelines of ERCOT and the ERCOT Protocols, as the same may <br />be amended hereafter. The Parties agree to cause their systems to be constructed in accordance <br />with specifications at least equal to those provided by the National Electrical Safety Code, <br />approved by the American National Standards Institute, in effect at the time of construction. <br />Except as otherwise provided in the Facility Schedules, each Party will be responsible for the <br />equipment and facilities it owns on its side of the Point of Interconnection. <br />4.4 From time to time, a Point of Interconnection may be added, changed, modified, <br />or deleted from this Agreement as mutually agreed by the Parties and/or as ordered by a <br />regulatory authority having jurisdiction thereof. Any such change, addition, or deletion shall be <br />recorded in Exhibit A and a Facility Schedule in such a way that the numbering of the other <br />Facility Schedules is not changed. <br />4.5 Subject to regulatory approval, if required, unless mutually agreed, neither party <br />shall have the right to disconnect from the other Party at any Point of Interconnection specified <br />on Exhibit A and a Facility Schedule, originally attached to this Agreement or added subsequent <br />to the execution of this Agreement, except for reason of a material violation of the terms of this <br />Agreement, for which opportunity to correct such violation was given under Paragraph 15.1 of <br />this Agreement and such violation was not corrected in accordance with said Paragraph 15.1. <br />LCRA TSC — San Marcos Electric Utility Page 5 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.