Laserfiche WebLink
January 3, 2017 <br /> Square Feet 11,182 <br /> Teal Construction Company(Selected based upon Internal Scoring System) 4,341,700.00 <br /> Contingency 10% 434,170.00 <br /> FFE(not included in bid) 5,000.00 <br /> Knight Security 50,000.00 <br /> Telecommunications relocated 35,000.00 <br /> Land 523,139.00 <br /> Architectural 358,800.00 <br /> Cost Subtotal 5,747,809.00 <br /> Costs to be absorbed by San Marcos Utility Departments <br /> Water 30,000.00 <br /> Wastewater 40,000.00 <br /> Bluebonnet Electric Relocations 32,620.19 <br /> Permit Fees 6,821.02 <br /> Technology Fees 11.00 <br /> Impact Fees 64,608.00 <br /> 174,060.21 <br />