My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-043/approving a participation agreement with Lazy Oaks Ranch, LP providing for the City to participate in the cost of oversizing certain Public Water System improvements in an amount not to exceed $1,028,631
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-043/approving a participation agreement with Lazy Oaks Ranch, LP providing for the City to participate in the cost of oversizing certain Public Water System improvements in an amount not to exceed $1,028,631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2017 1:42:45 PM
Creation date
3/10/2017 1:07:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-43
Date
3/7/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LA CIMA - RR 12 BOOSTER PUMP STATION <br />PID MPA BID - 003 <br />Bid Opening: December 1, 2016 <br />CC Carlton Industries <br />Yes <br />Bid Bond <br />Yes <br />Addendum #1 Acknowledged <br />Yes <br />Addendum #2 Acknowledged <br />Yes <br />Addendum #3 Acknowledged <br />1.0 BASE BID <br />Unit <br />Bid ItemQuantityDescription Unit PriceAmount <br />1.11LS <br />30'X20' PRECAST CONCRETE BUILDING <br />$150,000.00$150,000.00 <br />1.23EA <br />3 - Domestic Booster Pumps (75 HP) w/ VFD's <br />$32,000.00$96,000.00 <br />1.31LS <br />Pump Station Site Work - Grading Plan, Silt Fence, and Rock Berms. <br />$30,000.00$30,000.00 <br />1.41LS <br />Electrical Equipment/Controls/Alarms <br />$282,600.00$282,600.00 <br />1.51LS <br />Generator (Approximately 200 KW) <br />$49,500.00$49,500.00 <br />1.81LS <br />Site Fencing (6' Chain Link Fence with gate) <br />$8,000.00$8,000.00 <br />1.91LS <br />Valves, Flow meters and Appurtenance <br />$39,000.00$39,000.00 <br />1.101LS <br />Electrical Service <br />$2,000.00$2,000.00 <br />1.111LS <br />RR12 Connection and Valves and Disinfection <br />$4,000.00$4,000.00 <br />SUBTOTAL BASE BID <br />$661,100.00 <br />ALTERNATE 1 <br />Unit <br />Bid ItemQuantityDescription Unit PriceAmount <br />A1.120LF <br />12" Suction Piping and Valves <br />$900.00$18,000.00 <br />A1.2100LF <br />12" Discharge Piping and Valves (100 feet from the PS Building) <br />$260.00$26,000.00 <br />SUBTOTAL ALTERNATE 1 <br />$44,000.00 <br />ALTERNATE 2 <br />Unit <br />Bid ItemQuantityDescription Unit PriceAmount <br />A2.120LF <br />Substitute 16" Suction Piping and Valves for Bid Item A1.1 <br />$1,300.00$26,000.00 <br />Substitute 16" Discharge Piping and Valves (100 feet from the PS Building) for Bid <br />A2.2100LF <br />$340.00$34,000.00 <br />Item A1.2 <br />SUBTOTAL ALTERNATE 2 <br />$60,000.00 <br />BID SUMMARY <br />1.0 BASE BID$661,100.00 <br />TOTAL BASE BID$661,100.00 <br />ALTERNATE 1$44,000.00 <br />BASE BID + ALTERNATE 1$705,100.00 <br />ALTERNATE 2$60,000.00 <br />BASE BID + ALTERNATE 2$721,100.00 <br />Note: Contractor's math was incorect on bid; amount corected for this tabulation. <br />Page 1 of 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.