Provider") <br />1.0.2 The Contractor will not subcontract any work under this Agreement without prior <br />written approval from the City. The Contractor will specify any work or services subcontracted <br />under this Agreement by separate written Agreements and those Agreements will be subject to <br />each provision of this Agreement. <br />1.0.3 Any provisions in this Agreement pertaining to the City's review, approval and/or <br />acceptance of written materials prepared by the Contractor and/or its subcontractor in <br />connection with this Agreement will not diminish the Contractor's responsibility for the <br />materials. <br />1.0.4 The Contractor will perform all of its services in coordination with the City. The <br />Contractor will advise the City of data and information the Contractor needs to perform its <br />services and the Contractor will meet with City representatives at mutually convenient times <br />to assemble this data and information. <br />1.0.5 The Contractor certifies that it is an Ignition Level 4 "Premier" Certified Integrator and <br />that it will provide a team of Ignition programmers with experience in SCADA, Information <br />Technology, Network Security, Data Management and a licensed, experienced Surface Water <br />`B' operator. In addition, the Contractor will have available, a fully staffed electrical team, a <br />drafting department fluent in CAD and 3-D Drafting, and a UL508 Certified Panel Shop if <br />necessary. <br />1.0.6 Andrew Ober, Project Manager, is the Contractor's Project Representative assigned to <br />this Project. The Contractor's representative will make sure that the Project is managed so that <br />the Project finishes by the mutually approved dates. Furthermore, it is the Project <br />Representative's responsibility to set meeting dates and facilitate these meetings. The Project <br />Start ("Project Start Date") will occur ten (10) calendar days from the date the San Marcos City <br />Council approves this Agreement. The schedule for completion of this Project is included in <br />Subsection 1.1.17 and the milestone payment schedule is included in Article 14. The <br />Contractor will not substitute another representative for this Project unless approved in writing <br />by the City in advance of such proposed substitution. In the event the City and the Contractor <br />cannot agree to the substitution of the Project Representative, the City may terminate this <br />agreement in accordance with Article 7. <br />1.1. SCADA SYSTEM DEVELOPMENT <br />The Contractor will: <br />1.1.1 Poll all device tags required from the SWTP and WWTP and develop all required <br />graphical screens. The City's existing screens will be used as a guide but the City will have <br />access to the development team to customize those screens as needed. The Contractor will <br />design these screens to allow simple and intuitive navigation as well as for quick accessibility <br />from the home screen, and the navigation bar will always be accessible to allow switching <br />between any major screens with one click. The screen design will include standard symbol <br />factory graphics and will also rely on the use of templates to make development efficient and <br />easily scalable. The Ignition platform will allow for alarming to be displayed with a visual <br />alert on the screen and/or an audible alert from the machine's speakers. Alarms are logged and <br />can be automatically sent to individuals using different mediums including email or SMS <br />