My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-069/approving an agreement with TMT Solutions, Inc. in connection with the Surface Water Treatment Plant and the Wastewater Treatment Plant Supervisory Control and Data Acquisition Systems for the Public Services Department in the total amount of
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-069/approving an agreement with TMT Solutions, Inc. in connection with the Surface Water Treatment Plant and the Wastewater Treatment Plant Supervisory Control and Data Acquisition Systems for the Public Services Department in the total amount of
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2017 2:38:18 PM
Creation date
5/3/2017 3:59:36 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-69
Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Provider") <br />1.0.2 The Contractor will not subcontract any work under this Agreement without prior <br />written approval from the City. The Contractor will specify any work or services subcontracted <br />under this Agreement by separate written Agreements and those Agreements will be subject to <br />each provision of this Agreement. <br />1.0.3 Any provisions in this Agreement pertaining to the City's review, approval and/or <br />acceptance of written materials prepared by the Contractor and/or its subcontractor in <br />connection with this Agreement will not diminish the Contractor's responsibility for the <br />materials. <br />1.0.4 The Contractor will perform all of its services in coordination with the City. The <br />Contractor will advise the City of data and information the Contractor needs to perform its <br />services and the Contractor will meet with City representatives at mutually convenient times <br />to assemble this data and information. <br />1.0.5 The Contractor certifies that it is an Ignition Level 4 "Premier" Certified Integrator and <br />that it will provide a team of Ignition programmers with experience in SCADA, Information <br />Technology, Network Security, Data Management and a licensed, experienced Surface Water <br />`B' operator. In addition, the Contractor will have available, a fully staffed electrical team, a <br />drafting department fluent in CAD and 3-D Drafting, and a UL508 Certified Panel Shop if <br />necessary. <br />1.0.6 Andrew Ober, Project Manager, is the Contractor's Project Representative assigned to <br />this Project. The Contractor's representative will make sure that the Project is managed so that <br />the Project finishes by the mutually approved dates. Furthermore, it is the Project <br />Representative's responsibility to set meeting dates and facilitate these meetings. The Project <br />Start ("Project Start Date") will occur ten (10) calendar days from the date the San Marcos City <br />Council approves this Agreement. The schedule for completion of this Project is included in <br />Subsection 1.1.17 and the milestone payment schedule is included in Article 14. The <br />Contractor will not substitute another representative for this Project unless approved in writing <br />by the City in advance of such proposed substitution. In the event the City and the Contractor <br />cannot agree to the substitution of the Project Representative, the City may terminate this <br />agreement in accordance with Article 7. <br />1.1. SCADA SYSTEM DEVELOPMENT <br />The Contractor will: <br />1.1.1 Poll all device tags required from the SWTP and WWTP and develop all required <br />graphical screens. The City's existing screens will be used as a guide but the City will have <br />access to the development team to customize those screens as needed. The Contractor will <br />design these screens to allow simple and intuitive navigation as well as for quick accessibility <br />from the home screen, and the navigation bar will always be accessible to allow switching <br />between any major screens with one click. The screen design will include standard symbol <br />factory graphics and will also rely on the use of templates to make development efficient and <br />easily scalable. The Ignition platform will allow for alarming to be displayed with a visual <br />alert on the screen and/or an audible alert from the machine's speakers. Alarms are logged and <br />can be automatically sent to individuals using different mediums including email or SMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.