Laserfiche WebLink
a) Assist the City in making User Rights and Permissions decisions. <br />b) Make changes to the database to implement those decisions. <br />c) Test the changes and make sure they work correctly. <br />1.1.14 Setup all the I/O Devices. The Contractor will ensure that all UO devices are correctly <br />connected at both sites. <br />1.1.15 Write the conversion of data for the existing software currently in place from National <br />Instruments Lookout System for the Project to include: <br />a) Convert all existing historical data to Ignition from the Citadel Database; <br />b) Write the code to convert the data; <br />C) Convert the data to Ignition; and <br />d) Test the data in Ignition. <br />Software Installation <br />The Contractor will: <br />1.1.16 Implement the Project in five (5) phases which includes software installation at both <br />sites. The phases are: <br />a) Database Connectivity; <br />b) Development; <br />c) Thorough Testing; <br />d) Training, and <br />e) Support. <br />The Contractor will install the software on multiple physical servers for redundancy and <br />failover. The software will include server/client installs in an isolated network, segregated or <br />VLAN from the rest of the network. The software will deliver alerts, audible alarms for <br />maintenance, and threshold instances from the previous software. The database connectivity <br />will provide different levels of permissions and rights for users throughout the system. The <br />Contractor will ensure that data is backed up daily, and will be able to be restored in a <br />reasonable time frame. It will also provide numerous reports for trending and previous <br />historical data. The Consultant will design and build screens for all the I/Os for the Surface <br />Water and Wastewater Plants. Alarms and Alert thresholds will be designed by the Consultant <br />and put in place, to be retrieved via email, mobile device, etc. which include iPhone and <br />Android smartphones along with tablets that run Mac OS, Android, or Windows. The <br />Consultant will ensure that testing consists of user acceptance for Project screens that are being <br />developed for all the I/Os for each plant. The Consultant will export the Legacy database from <br />the previous software and imported into the new software. The systems will run, with complete <br />functionality, of both systems simultaneously side-by-side for testing purposes and approval. <br />The Consultant will provide adequate training on each screen that is developed for operators, <br />administrative personnel, IT personnel, and all other required individuals. The Contractor will <br />provide an operational manual and documentation at this time. <br />Support will include Knowledge Based Training videos, and 24/7/365 via email or on-call. <br />