Laserfiche WebLink
ENERGY•WATER•COMMUNITY SERVICES <br /> CUSTOMER: San Marcos Electric Utility <br /> LCRA CUSTOMER SERVICES CONTRACT 630 East Hopkins <br /> San Marcos,TX 78666 <br /> • <br /> PROJECT:Hilltop Substation DATE SUBMITTED: September 27,2016 <br /> SCOPE OF SERVICES: JOB NUMBER: 1017017 <br /> The Lower Colorado River Authority(LCRA)shall provide to San Marcos Electric Utility(SMEU)engineering, <br /> material and construction services for the proposed Hilltop Substation as described in the attached Schedule A.If you <br /> have any questions regarding this contract,please contact the Project Manager,Sonya Strambler at(512)578-1856. <br /> SCHEDULE: <br /> Design Engineering:September 19th-November 11th <br /> Material Procurement:February 6th-February 28th <br /> Construction:Coordinate with SMEU schedule <br /> CON TRACT PRICE: <br /> Billing will be on a cost plus basis invoiced monthly. <br /> Estimated Total Cost: $75,255 <br /> Customer and the Lower Colorado River Authority agree that the work described above shall be performed in accordance with the <br /> terms and conditions on the front and reverse sides of this form. <br /> San Marc' Electric Utility Low•` C I lora'. •'ver Aut I ' <br /> • <br /> By: t'l. /O/�0 _ / By:• <br /> j I <br /> Title: ritieelirnn Mgrtyrr Title: , , <br /> Date: 04•. 25. 1 Date: Stpt a], 2O) 6 <br /> OFFICE USE ONLY Contract Administrator: Sonya Strambler <br /> Accounting: 1017017/PMT/400300 Administration Date: 9/27/2016 <br /> P.O.BOX 220•AUSTIN,TEXAS • 78767-0220 • (512)473-3200 • 1-800-776-5272 •WWW.LCRA.ORG <br />