My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-070/approving a contract with the Lower Colorado River Authority (LCRA) providing for payment to LCRA in the amount of $75,255 for its costs to construct a high voltage bus extension necessary for LCRA to provide electric transmission power to a
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-070/approving a contract with the Lower Colorado River Authority (LCRA) providing for payment to LCRA in the amount of $75,255 for its costs to construct a high voltage bus extension necessary for LCRA to provide electric transmission power to a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 4:08:33 PM
Creation date
5/3/2017 4:08:33 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-70
Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENERGY•WATER•COMMUNITY SERVICES <br /> CUSTOMER: San Marcos Electric Utility <br /> LCRA CUSTOMER SERVICES CONTRACT 630 East Hopkins <br /> San Marcos,TX 78666 <br /> • <br /> PROJECT:Hilltop Substation DATE SUBMITTED: September 27,2016 <br /> SCOPE OF SERVICES: JOB NUMBER: 1017017 <br /> The Lower Colorado River Authority(LCRA)shall provide to San Marcos Electric Utility(SMEU)engineering, <br /> material and construction services for the proposed Hilltop Substation as described in the attached Schedule A.If you <br /> have any questions regarding this contract,please contact the Project Manager,Sonya Strambler at(512)578-1856. <br /> SCHEDULE: <br /> Design Engineering:September 19th-November 11th <br /> Material Procurement:February 6th-February 28th <br /> Construction:Coordinate with SMEU schedule <br /> CON TRACT PRICE: <br /> Billing will be on a cost plus basis invoiced monthly. <br /> Estimated Total Cost: $75,255 <br /> Customer and the Lower Colorado River Authority agree that the work described above shall be performed in accordance with the <br /> terms and conditions on the front and reverse sides of this form. <br /> San Marc' Electric Utility Low•` C I lora'. •'ver Aut I ' <br /> • <br /> By: t'l. /O/�0 _ / By:• <br /> j I <br /> Title: ritieelirnn Mgrtyrr Title: , , <br /> Date: 04•. 25. 1 Date: Stpt a], 2O) 6 <br /> OFFICE USE ONLY Contract Administrator: Sonya Strambler <br /> Accounting: 1017017/PMT/400300 Administration Date: 9/27/2016 <br /> P.O.BOX 220•AUSTIN,TEXAS • 78767-0220 • (512)473-3200 • 1-800-776-5272 •WWW.LCRA.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.