My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04.24.17 CDBG-DR Workshop-Feasibility Study
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2017
>
04.24.17 CDBG-DR Workshop-Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2017 4:13:46 PM
Creation date
5/22/2017 10:39:24 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Minutes
City Clerk - Type
Workshops
Date
4/24/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SANiMARCOS630 East Hopkins <br />City of San Marcos San Marcos, TX 78666 <br />Meeting Minutes <br />City Council <br />Monday, April 24, 2017 5:30 PM City Council Chambers <br />630 E. Hopkins - CDBG-DR Workshop -Feasibility Study <br />I. Call To Order <br />With a quorum present, the CDBG-DR Workshop of the San Marcos City <br />Council was called to order by Mayor Thomaides at 5:30 p.m. Monday, April <br />24, 2017 in the City Council Chambers, 630 E. Hopkins, San Marcos, Texas <br />78666. <br />II. Roll Call <br />Present: 7 - Mayor John Thomaides, Mayor Pro -Tem Jane Hughson, Deputy Mayor Pro Tem <br />Lisa Prewitt, Council Member Saul Gonzales, Council Member Ed Mihalkanin, <br />Council Member Scott Gregson and Council Member Melissa Derrick <br />1. Receive a presentation and update regarding the Community Development Block <br />Grant - Disaster Recovery (CDBG-DR) Grant; the findings of the Infrastructure <br />Feasibility Study and the identification of infrastructure projects to address flooding in <br />the neighborhoods affected by the 2015 floods, and provide direction to Staff. <br />Laurie Moyer, Director of Engineering and CIP, provided an introduction to <br />the Council regarding the infrastructure update, and introduced Daniel Zail <br />with AECOM to review the study and provide a recommendation of the <br />projects that should be funded to address flooding issues. Mr. Zail introduced <br />the team involved with the Infrastructure feasibility studies. Mr. Zail reviewed <br />Blanco River flood events from 1957 to present. <br />He provided the current findings that showed that the projects recommended <br />will increase protection during local rainfall events, but during larger events <br />flooding will still occur. There were numerous stakeholder meetings and site <br />visits throughout the study to determine needs. The Blanco Gardens Riverine <br />solution was discussed which proposes drainage improvements and a bank <br />improvement trail, either a paved surface or vegetated surface could be <br />created. This bank improvement trail could potentially tie into the City <br />proposed trail at a later time. Overflow channels would be created as well to <br />further increase protection from future flood events. <br />Mr. Zail presented possible solutions to address local drainage issues in the <br />City of San Marcos Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.