Laserfiche WebLink
Attachment B: Price Proposal <br /> PROPOSAL NAME: CDBG-DR HOUSING CASE MANAGEMENT AND <br /> PRE-CONSTRUCTION SERVICES <br /> Item Not to Exceed <br /> Description Cost Pricing Method <br /> 1 Application Relations $176,500 $176,500.00 Lump Sum <br /> Calculation of Cost of <br /> 2 $67,250 $840.63 Each <br /> Rehabilitation/Reconstruction <br /> 3 Reporting $14,375 $14,375.00 Lump Sum <br /> 4 Environmental Review $78,160 $977.00 Each <br /> 5 Document Management $25,000 $25,000.00 Lump Sum <br /> 6 Legal Services $47,040 $47,040 Lump Sum <br /> 7 Pre-Construction Services $204,480 <br /> Oversight and Design <br /> Services $81,420.00 Lump Sum <br /> Pre-Construction <br /> Topographical Survey $630.00 Each <br /> Initial Elevation Certificate $472.50 Each <br /> Foundation Engineering $420.00 Each <br /> Redesign $157.50 Each <br /> 8 Other Direct Costs $29,800 Per Receipts Lump Sum <br /> TOTAL $642,605 <br /> In light of a reduced population of 56 applications,AECOM respectfully submits the above price proposal for RFP <br /> #217-310.Per conversations with City of San Marcos staff,AECOM believes this hybrid model that combines <br /> lump sum and unit-based pricing would be a mutually beneficial arrangement to ultimately contain costs for both <br /> parties. <br /> With regard to the City's desired additional services listed below,AECOM and our partnering firms will absorb the <br /> cost within our existing structure. <br /> o Two(2)applicant workshops in the neighborhoods cited in the Action Plan <br /> o Door-to-door canvassing for applicants in the neighborhoods cited in the Action Plan <br />