Laserfiche WebLink
xiii. Utility Layout: FNI will provide color coded layout sheets of the existing utilities. <br /> xiv. Utility Coordination: FNI will identify conflicts with a utility conflict exhibit(s). The <br /> City will initiate discussions with utility owners, and FNI will support as requested by <br /> the City(e.g. attendance at meetings). <br /> xv. Utility Design: Improvements to the City utilities will include the following: <br /> 1. Water: Design plan and profile layout of proposed pipeline, appurtenances and tie- <br /> in locations for approximately 1,800 LF of water main(12 inches in diameter). <br /> 2. Wastewater: Design plan and profile of proposed pipeline, appurtenances, and tie- <br /> in locations for up to 1,000 LF of wastewater main. <br /> C. TDLR Review—See Additional Services <br /> D. Permitting Submittals—See Additional Services <br /> E. Deliverables (Plans will be 11-inch by 17-inch) <br /> i. Monthly Status Report: A monthly status report will be developed and submitted to the <br /> City Project Manager. The status report shall summarize work completed; percent <br /> complete to date for the schedule and budget; work scheduled to be completed for the <br /> upcoming month; and any outstanding issues or decisions that must be resolved by City <br /> staff or the project team. Updates to the project schedule will be provided, as needed <br /> and determined by project status. Anticipated to be brief, one-page reports to <br /> accompany invoices. <br /> ii. 60% Submittal <br /> 1. Plan Set <br /> a. Cover Sheet using City title block <br /> b. Project Layout Sheet: scale of 1-inch= 100-feet <br /> c. Roadway and Drainage Plan Sheets: Horizontal scale of 1-inch=40-feet and a <br /> vertical scale of 1-inch= 10-feet <br /> d. List of Standard Details <br /> e. List of Standard Specifications <br /> f. Project Specific/Special Specifications <br /> g. Project Specific/Special Details <br /> 2. Opinion of Probable Construction Cost <br /> 3. Construction Schedule: Time determination schedule per traffic control phase <br /> based on the critical path scheduling method using locally published production <br /> rates for construction. The construction time determination schedule will be based <br /> on a five (5) day work week with a normal eight (8) hour work day. If required, <br /> additional time determination schedule alternatives will be developed as an <br /> additional service. <br /> 4. Submittal includes: <br /> • 4 (four) copies— 11"x17"plans <br /> • 1 (one) copy—supporting documents <br />