Laserfiche WebLink
Summary of Manhours by Classification <br />The Wallace Group, Inc. <br />HOPKINS STREET MULTI -USE BIKE AND PEDESTRIAN PROJECT <br />Description of Work or Task <br />Project <br />Manager <br />$140.00/Hr <br />Sr. CAD <br />Tech <br />$90.00/Hr <br />Research <br />Tech <br />$90.00/Hr <br />Survey <br />Crew/GPS <br />$150.00/Hr <br />SUE <br />Locator <br />$90.00/Hr <br />Admin / <br />Clerical <br />$70.00/Hr <br />Railroad <br />Permit & On-site <br />$1,600.00/Hr <br />Staff -Hr. <br />Totals <br />Staff <br />Cost/ Task <br />Totals <br />Task: Design Survey <br />a. Project Admin / Setup <br />b. Establish honz. & vert secondary control <br />1 <br />1 <br />6 <br />2 <br />2 <br />6 <br />2 <br />9 <br />$210.00 <br />$1,220.00 <br />c. Design Topographic & Cross -Section Survey <br />g80 <br />d. Research utilities & obtain manhole & storm drain int <br />16 <br />10 <br />60 <br />10 <br />102 <br />22 <br />$14,280.00 <br />$2,680.00 <br />e. Prepare Deliverables & QA/QC <br />10 <br />1 <br />71 <br />$6,870.00 <br />Direct Expenses <br />----.. - - - — <br />Field Surveying Subtotal: <br />88 <br />0 <br />$0.00 <br />20 <br />0 <br />96 <br />0 <br />2 <br />0 <br />206 <br />$25,260.00 <br />Task: Determining Existing ROW <br />a. Project Admin /Setup <br />- .- - --------- - --- <br />b. Establish horiz. & vert. primary control <br />- ---- --- <br />c. Research, locate & tie ROW <br />d. Analyze & Determine ROW <br />e. Prepare Deliverables & QA/QC <br />- - - _- - - <br />Direct Expenses <br />2 <br />10 <br />2 <br />$210.00 <br />1 <br />4 <br />4 <br />4 <br />10 <br />8 <br />20 <br />11 <br />44 <br />$1,520.00 <br />$5,360.00 <br />10 <br />14 <br />$1,460.00 <br />10 <br />14 <br />$1,460.00 <br />-- -- - --- - -- <br />Feld Surveying Subtotal: <br />Task: Railroad Survey <br />10 <br />28 <br />0 <br />1 <br />0 <br />0 <br />85 <br />$0.00 <br />$10,010.00 <br />14 <br />32 <br />a. Permit Process & On -Site R/R Representative <br />b. Establish horiz & vert. secondary control <br />1 <br />1 <br />1 <br />3 <br />$1,830.00 <br />0 <br />$0.00 <br />c. Research, locate & tie and analyze ROW <br />--- - <br />0 <br />$0.00 <br />— - -- <br />d. Design Topographic & Cross -Section Survey <br />e. Prepare Deliverables & QA/QC <br />0 <br />$0.00 <br />- - ----- - <br />Direct Expenses <br />0 <br />$0.00 <br />-- --- --- -- -_ - - <br />Feld Surveying Subtotal: <br />1 <br />0 <br />0 <br />_ <br />0 <br />0 <br />1 <br />0 <br />3 <br />$0.00 <br />$1,830.00 <br />1 <br />10/9/2017 <br />