My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-180/approving a change order amendment to the participation agreement with Lazy Oaks Ranch, LP in order to add the installation of conduit for fiber optic lines to the public improvements being installed on behalf of the City within the La Cima
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-180/approving a change order amendment to the participation agreement with Lazy Oaks Ranch, LP in order to add the installation of conduit for fiber optic lines to the public improvements being installed on behalf of the City within the La Cima
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 1:36:40 PM
Creation date
12/18/2017 11:02:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-180
Date
12/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
jIN <br />PROJECT NAME: LA CIMA <br />PROVIDER: SAN MARCOS TELECOM <br />DATE: NOVEMBER 21, 2017 <br />ITEM <br />QTY <br />UNIT <br />DESCRIPTION <br />$ 2.85 $ <br />PRICE <br />2 1 200 1 LF 6" BORE WITH STEEL CASING & GROUT <br />TOTAL <br />1 <br />1,425 <br />LF <br />1-3" INSTALL CONDUIT IN JOINT TRENCH <br />$ <br />2.85 <br />$ <br />4,061.25 <br />2 <br />1,025 <br />LF <br />RE -EXCAVATE DITCH FOR 2 CONDUITS <br />$ <br />5.08 <br />$ <br />5,207.00 <br />3 <br />1,025 <br />LF <br />1-3" INSTALL CONDUIT IN RE -EXCAVATED TRENCH <br />$ <br />2.85 <br />$ <br />2,921.25 <br />4 <br />210 <br />LF <br />1- 2" AT STREET CROSSINGS <br />$ <br />2.85 <br />$ <br />598.50 <br />5 <br />1,500 <br />LF <br />14' INSTALL CONDUIT IN RE -EXCAVATED TRENCH <br />$ <br />3.80 <br />1 $ <br />5,700.00 <br />SUB -TOTAL ELECTRIC IMPROVEMENTS - BLVD <br />$ <br />18,488.00 <br />TOTAL DRY UTILITY IMPROVEMENTS $ 18,488.00 <br />TOTAL DRY UTILITY IMPROVEMENTS $ 85,195.80 <br />OPTION No. 3 - ONE 3" CONDUIT TO AT LOOP 12 ENTRY <br />ITEM QTY UNIT DESCRIPTION <br />PRICE <br />TOTAL <br />1 1,389 LF 1-3" INSTALL CONDUIT IN JOINT TRENCH <br />$ 2.85 $ <br />3,958.65 <br />2 1 200 1 LF 6" BORE WITH STEEL CASING & GROUT <br />$ 153.48 1 $ <br />30,696.00 <br />SUB -TOTAL ELECTRIC IMPROVEMENTS - BLVD <br />$ <br />34,654.65 <br />TOTAL DRY UTILITY IMPROVEMENTS $ 34,654.65 <br />TOTAL OPTIONS No. 1, 2 & 3 $ 138,338.45 <br />PROPOSAL CONTINGENCIES: <br />Denbow Company, Inc.'s Proposal is contingent on the following: <br />1. The parties reaching agreement on acceptable contract terms and conditions including, but not limited to, scope of work, <br />payment, differing site conditions, exclusion by Denbow Company, Inc. of any warranty of suitability of design documents, <br />indemnity, insurance, and waivers of consequential damages. <br />2. An agreement that the retainage, if any, shall be paid to Denbow Company, Inc. within thirty five (35) days following the <br />completion of its work on the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.