My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2018-007/approving an agreement between the City and K Friese & Associates, Inc. for the provision of a Community Development Block Grant-Disaster Recovery (CDBG-DR) Professional Engineering Services in connection with the Sessom Waterline Repair De
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2018
>
Res 2018-007/approving an agreement between the City and K Friese & Associates, Inc. for the provision of a Community Development Block Grant-Disaster Recovery (CDBG-DR) Professional Engineering Services in connection with the Sessom Waterline Repair De
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2018 9:23:25 AM
Creation date
2/5/2018 8:54:24 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2018-07
Date
1/30/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E SESSOM WATERLINE REPAIR PROJECT <br /> ID Task Name Duration Start if inish 42D1;3r_L201 QN2,201t !r 3,201#Qrr4 ZO,1/Qtr 1,, <br /> VD clan Fe tt.Lailun uliuyxnM ouDe•Janb 1 E.SESSOM WATERLINE REPAIR PROTECT SO Mrs Mon 1/22/18 Fri 1/4/19 <br /> 2 PHASE A-PRELIMINARY PHASE(30%( 13 wits Mon 1/22/18 Fri 4/20/18 i wawa..., <br /> 3 Notice-to-Proceed Owks Mon 1/22/1.8 Mon 1/22/18 1/22 <br /> 4 I Kick-off Meeting 1 wk Mon 1/22/18 Frl 1/26/18 ' <br /> S { Data Collection 2 wks Mon 1/22/18 Fri 2/2/18 <br /> - 6 Field Investigations 5 wks Mon 1/29/18 Fri 3/2/18 <br /> 7 Geotech 5 wks Mon 1/29/18 Fri 3/2/13 <br /> 8 Archaeological Research 5 wks Mon 1/29/18 Fri 3/2/18 <br /> 9 Pipeline Alignment Options 2 wks Mon 2/5/18 Fri 2/16/18 <br /> 10 1 Permitting/Design Requirements 1 wk Mon 2/19/18 Fri 2/23/18 <br /> 11-�I Utility Conflcts 1 wk Mon 2/19/18 Fri 2/23/18 - <br /> 12 Cost Estimates 1 wk Mon 2/26/18 Fri 3/2/18 <br /> 13 11 Draft Preliminary Eng Design Memo 1 wk Mon 2/26/18 Fri 3/2/18 <br /> 14T OA/QC 2 wks Mon 3/5/18 Fri 3/16/18 <br /> 15 Draft PEDM Submittal 0 wks Fri 3/16/18 Fri 3/16/18 /16 <br /> 16 City Review&Review Meeting 3 wks Mon 3/19/18 Fri 4/6/18 <br /> 17 I Final PEDM 2 wks Mon 4/9/18 Fri 4/20/18 1IlLugl <br /> 18 PHASE B-DESIGN PHASE(90%/100%( 15 wks Mon 4/23/18 Frl 8/3/18 <br /> 19 i 90%Design 9 wks Mon 4/23/18 Frl 6/22/18 Timm1 <br /> 20 , Construction Plans 3 wks Mon 4/23/18 Fri 5/11/18 a <br /> l <br /> 11 Specifications 1 wk Mon 5/14/18 Fri 5/18/18 I <br /> 22—i <br /> — Cost Estimates 1 wk Mon 5/14/18 Frl S/18/18 <br /> 23 1 QA/QC 1 wk Mon 5/21/18 Fri 5/25/18 FI <br /> 24 i P/U Comments&Reproduction 1 wk Mon 5/28/18 Fri 6/1/18 <br /> 25 -I! 90%Submittal 0 wks Fri 6/1/18 Frl 6/1/18 I. <br /> 26 1 City Review&Review Meeting 3 wks Mon 6/4/18 Fri 6/22/18 <br /> 27 100%Design 6 wks Mon 6/25/18 Fri 8/3/18 <br /> ie Construction Plans 3 wks Mon 6/25/18 Fri 7/13/18 1 <br /> 29 1 Specifications 1 wk Mon 7/16/18 Fri 7/20/18 I <br /> 30 Cost Estimates 1 wk Mon 7/16/18 Fri 7/20/18 <br /> 31 QA/QC 1 wk Mon 7/23/18 Fri 7/27/18 <br /> 32 P/U Comments&Reproduction 1 wk Mon 7/30/18 Fri 8/3/18 <br /> 33 I 100%Submittal 0wks Fri 8/3/18 Fri 3/3/18 _ 8/3 <br /> - _I <br /> 34 I PHASE C-BID PHASE 12 wks Mon 8/6/18 Fri 10/26/18 <br /> 35 1 PHASED-CONSTRUCTION PHASE 8 wks Mon 10/29/18 Fri 12/21/18 <br /> 36 IL PHASE E-RECORD DRAWINGS 2 wks Mon 12/24/18 Fri 1/4/19 <br /> Thu 11/30/12 1 of I K FRIESE t ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.