My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2018-021/awarding a design contract to Alan Plummer Associates, Inc. of 630 La Calma Drive, Suite 400, Austin, Texas; for the Sunset Acres Drainage Preliminary Engineering services, in the estimated amount of $187,900
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2018
>
Res 2018-021/awarding a design contract to Alan Plummer Associates, Inc. of 630 La Calma Drive, Suite 400, Austin, Texas; for the Sunset Acres Drainage Preliminary Engineering services, in the estimated amount of $187,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2018 3:07:26 PM
Creation date
3/1/2018 8:44:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2018-21
Date
2/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALAN PLUMMER <br />ASSOCIATES, INC. <br />2016-233-01 <br />January 19, 2018 <br />Mr, Rohit ViJ, P.E. <br />Project Manager <br />City of San Marcos <br />630 East Hopkins <br />San Marcos, Texas 78666 <br />Re: Professional Services Agreement <br />Sunset Acres Drainage Project <br />Dear Mr. Vij: <br />Alan Plummer Associates, Inc. (APAI) is pleased to submit the attached, revised proposal <br />for Professional Services associated with Preliminary Engineering for Storm Drain and other <br />improvements within the Sunset Acres Subdivision. This is a continuation of the work <br />previously completed to coordinate with TxDOT concerning anticipated flows in the area. <br />The services will include Preliminary Engineering to improve the stonn drain system to <br />handle the 25 -year storm. This will likely include total street reconstruction in the area. hi <br />addition, traffic calming and pedestrian/bicycle improvements will be considered. Finally, <br />some utility improvements will also be included. These services will be provided for a <br />Lump Sum fee of One Hundred Eighty Seven Thousand Nine Hundred Dollars ($187,900). <br />Based on the timely receipt of a Notice -to -Proceed with this work, the draft Preliminary <br />Engineering Report will be completed within 6 months. <br />If we can be of further assistance, please do not hesitate to contact me at (512) 452-5905 <br />Sincerely, <br />ALAN PLUMMER ASSOCIATES, INC, <br />TBPE Firm Registration No. 13 <br />StepYhn J.qConan, P.E. <br />Principal <br />Sic/j 1 <br />6300 LA CALMA DRIVE Enclosures <br />SUITE 400 <br />AUSTiN,TEXAS 78752 <br />PHONE 512.452.5905 <br />FAX 512.452,2325 <br />Www.1paienv,corn C:\Users\stevekDocutnenls\Vij_ltr_surisel—acres—PE.docx <br />TBPE Firm No. 13 (t <br />
The URL can be used to link to this page
Your browser does not support the video tag.