My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2018-021/awarding a design contract to Alan Plummer Associates, Inc. of 630 La Calma Drive, Suite 400, Austin, Texas; for the Sunset Acres Drainage Preliminary Engineering services, in the estimated amount of $187,900
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2018
>
Res 2018-021/awarding a design contract to Alan Plummer Associates, Inc. of 630 La Calma Drive, Suite 400, Austin, Texas; for the Sunset Acres Drainage Preliminary Engineering services, in the estimated amount of $187,900
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2018 3:07:26 PM
Creation date
3/1/2018 8:44:06 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2018-21
Date
2/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OFSAN MARCOG <br />ON-CALL ENGINEERING SERVICES FOR CDBR—ORINFRASTRUCTURE <br />PROJECTS <br />SUNSET ACRES DRAINAGE STUDY <br />SCOPE OFSERVICES <br />Project Understanding <br />As part of the 2017 On -Call Engineering Services C[)BG — DR Infrastructure program, <br />the City of San Marcos (COGM) has requested Alan Plummer and Associates, Inc. <br />k4PA|\ to prepare a preliminary dnminoge, traffic calming, and bicycle/pedestrian study <br />for the Sunset Acres neighborhood from the |H-35 northbound frontage road to <br />Guadalupe Street (SH 133). The streets included within the study area include: <br />° Broadway 5tUH-35NBFRtoGuadalupe) <br />• Patricia Dr <br />^ Candlelight Ln (Del Sol to Patricia) <br />w Lockwood St <br />w Parkda|eOr <br />w Magnolia Dr <br />* VVoodcreotGt <br />* Ebony St <br />^ Parke Dr <br />° Oakdale Gt/N.ufBroadway St) <br />Alan Plummer Associates, Inc. AAPA|\ has requested that K Frkese + Associates (KFA) <br />be part of the Project Team as o suboonsuKnnt. KFA will provide preliminary <br />engineering services, including: <br />Evaluation of traffic calming alternatives todiscourage cut -through traffic from the <br />northbound frontage nned of/H-35to Guadalupe Street (SH 123). <br />Preliminary plans and cost estimates for selected traffic calming alternatives <br />Preliminary typical sections and cost estimates for bioyc|elp8dnstrionfaoi|itiea in <br />the Sunset Acres neighborhood. The recommended alternatives will include a <br />Safe Nou[aS to Gohno| analysis to address all streets within the neighborhood <br />and pedestrian crossings atsignalized intersections. <br />Basic Scope of Services <br />Preliminary Engineering <br />1. Project Management and QA/QC: This task includes routine communication with <br />the Prime; invoicing; manpower and schedule management; QA/QCrevevva; and <br />other activities associated with managing KFA's portion of the project. <br />2. Meetings <br />a. Kick-off Meeting: KFAwiU attend one kick-off meeting with the Project <br />Team to kick off the project. <br />Traffic Calming Meeting — KFA will attend one meeting with the Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.