Laserfiche WebLink
:vnri'c�iniva�ta5 <br />Site Fees <br />Effective March 1, 2010 (Ord. 2010®05) <br />Watershed Protection <br />Watershed Protection Plan Phase 1 <br />$800.00 <br />Watershed Protection Phase 11 Iwith or without Site Prep <br />Public Improvement Construction <br />$1,200.00 plus $50.00 /acre ($3,000 max) <br />Plans (PICP) <br />Subdivision Improvements including more than one type of Infrastructure <br />includes the entire limits of construction <br />$2,250.00 plus $50.00 /acre ($4,000 max) <br />Individual Transportation or Utility Infrastructure Extensions (not to exceed the <br />fee for more than one type of infrastructure) <br />$1,117.00 plus $5 per linear ft of each improvement <br />Out of City Utility Extension <br />$750 <br />Out of Cit Utilit Connection <br />$0 <br />Weekend &After Hours Public Improvement Inspection <br />Site Preparation <br />$100.00/hour, 4 hour minimum <br />Site Preparation requires engineer) does not include WPP review <br />$1,700.00 plus $50.00 / acre <br />Small Site Preparation <br />$300.00 <br />Permit to install on-site sewage disposal system <br />$178.00 <br />Traffic Impact Analysis (TIA) <br />$750.00 <br />TIA Worksheet <br />$112.00 <br />CL OMR or LOMR without approved CLOMR <br />$2,500.00 <br />LOMRwith approved CLOMR <br />$1,500.00 <br />LOMA <br />Driveway/Sidewalk <br />1$500.00 <br />Residential (Type I Driveway or Sidewalk <br />1$29.00 <br />Commercial (Type 11 Driveway or Sidewalk <br />$56.00 <br />ROW Maintenance/ Improvement Permit <br />Other <br />15% of proiect value $55.00min/$2,200.00 max <br />My Permit Now Technology Fee (applied to all permits) <br />$11.00 <br />On -premise signs <br />$2.50 per square ft $50 min <br />Off -premise signs / billboards <br />$280.00 <br />Fence permit Fee <br />$56.00 <br />Resubmittal Fee (All Permit Types) <br />$280.00 each resubmittal after the second <br />Reinspection Fee (2nd and subsequent inspections) <br />Residential $55.00 <br />Commercial $250.00 <br />Multi -Family $300.00 <br />Additional fee after 2nd Reinspection $100.00 <br />Sidewalk Fee -in -Lieu <br />$6.00 per square ft <br />SmartCode Protected Trees (with the adoption ofcodcSMTX, 'Smarecode"wi//be removed) <br />$153.00 per Caliper Inch <br />SmartCode Heritage Tree (with the adoption ofCodeSMTX, "Smar(code^wits be removed) <br />$305.00 per Caliper inch <br />Code SMTX: Water Quality Fee -in -Lieu <br />$14,629 / acre $0.34 / square foot <br />Code SMTX: Detention Fee -in -Lieu <br />$7.35 / sq. ft. (up to 7,000 sq. ft. impervious cover <br />$4.77 / sq. ft. 7,001-28,000 sq. ft. impervious cover <br />$2.50 / sq. ft. 28,001-68,000 sq. ft. impervious cover <br />$1.65 / sq. ft. 68001-100,000 sq. ft. impervious cover <br />$1.00 / sq. ft. over 100,001 sq. ft. impervious cover <br />Code SMTX: Parkin Fee -in -Lieu reduction from 1.05 to 0.75 / bedroom <br />$5,000 / parking space <br />Code SMTX: Parkin Fee -in -Lieu reduction from 0.75 to 0.50 / bedroom <br />$10,000 / parking space <br />Code SMTX: Parkland Development Fee <br />$400.00 / unit <br />Code SMTX: Parkland Fee -in -Lieu <br />ROW Use Fees <br />$375.00 / sin Ie famil unit <br />$300.00 / multifamily unit <br />Short Term ROW Closure Neighborhood/Non-Profit (24 Hrs or Less) <br />$25.00 application fee <br />Short Term ROW Closure Commercial (24 Hrs or Less) <br />$50.00 application fee <br />Long Term ROW Closure Commercial <br />100.00 application fee + $100.00 / week (per lane per <br />block) <br />Floodplain Fees <br />Floodplain permit application (Single Family) <br />$29.00 <br />Floodplain permit application (Commercial) <br />$168.00 <br />Single Family Infill - City Flood Analysis Fee <br />$1,000.00 <br />Floodplain Development Flood Analysis Review Fee <br />$1,500.00 plus $50 / acre (for acreage within floodplain) <br />" 7.1111 inulluuI 411ra : should Yrd, roundod Lia :1-[o-; in=s>ajir nll wll ollo i iGarnlbell CODE SMTX Fees will be effective following the adoption of Code SMTX <br />