My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2018-005/adopting fees to be charged by the City for various city services, including changes to some existing fees and the addition of new fees
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2018
>
Ord 2018-005/adopting fees to be charged by the City for various city services, including changes to some existing fees and the addition of new fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2018 4:11:09 PM
Creation date
3/12/2018 2:13:51 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Approving
Number
2018-05
Date
2/19/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
:vnri'c�iniva�ta5 <br />Site Fees <br />Effective March 1, 2010 (Ord. 2010®05) <br />Watershed Protection <br />Watershed Protection Plan Phase 1 <br />$800.00 <br />Watershed Protection Phase 11 Iwith or without Site Prep <br />Public Improvement Construction <br />$1,200.00 plus $50.00 /acre ($3,000 max) <br />Plans (PICP) <br />Subdivision Improvements including more than one type of Infrastructure <br />includes the entire limits of construction <br />$2,250.00 plus $50.00 /acre ($4,000 max) <br />Individual Transportation or Utility Infrastructure Extensions (not to exceed the <br />fee for more than one type of infrastructure) <br />$1,117.00 plus $5 per linear ft of each improvement <br />Out of City Utility Extension <br />$750 <br />Out of Cit Utilit Connection <br />$0 <br />Weekend &After Hours Public Improvement Inspection <br />Site Preparation <br />$100.00/hour, 4 hour minimum <br />Site Preparation requires engineer) does not include WPP review <br />$1,700.00 plus $50.00 / acre <br />Small Site Preparation <br />$300.00 <br />Permit to install on-site sewage disposal system <br />$178.00 <br />Traffic Impact Analysis (TIA) <br />$750.00 <br />TIA Worksheet <br />$112.00 <br />CL OMR or LOMR without approved CLOMR <br />$2,500.00 <br />LOMRwith approved CLOMR <br />$1,500.00 <br />LOMA <br />Driveway/Sidewalk <br />1$500.00 <br />Residential (Type I Driveway or Sidewalk <br />1$29.00 <br />Commercial (Type 11 Driveway or Sidewalk <br />$56.00 <br />ROW Maintenance/ Improvement Permit <br />Other <br />15% of proiect value $55.00min/$2,200.00 max <br />My Permit Now Technology Fee (applied to all permits) <br />$11.00 <br />On -premise signs <br />$2.50 per square ft $50 min <br />Off -premise signs / billboards <br />$280.00 <br />Fence permit Fee <br />$56.00 <br />Resubmittal Fee (All Permit Types) <br />$280.00 each resubmittal after the second <br />Reinspection Fee (2nd and subsequent inspections) <br />Residential $55.00 <br />Commercial $250.00 <br />Multi -Family $300.00 <br />Additional fee after 2nd Reinspection $100.00 <br />Sidewalk Fee -in -Lieu <br />$6.00 per square ft <br />SmartCode Protected Trees (with the adoption ofcodcSMTX, 'Smarecode"wi//be removed) <br />$153.00 per Caliper Inch <br />SmartCode Heritage Tree (with the adoption ofCodeSMTX, "Smar(code^wits be removed) <br />$305.00 per Caliper inch <br />Code SMTX: Water Quality Fee -in -Lieu <br />$14,629 / acre $0.34 / square foot <br />Code SMTX: Detention Fee -in -Lieu <br />$7.35 / sq. ft. (up to 7,000 sq. ft. impervious cover <br />$4.77 / sq. ft. 7,001-28,000 sq. ft. impervious cover <br />$2.50 / sq. ft. 28,001-68,000 sq. ft. impervious cover <br />$1.65 / sq. ft. 68001-100,000 sq. ft. impervious cover <br />$1.00 / sq. ft. over 100,001 sq. ft. impervious cover <br />Code SMTX: Parkin Fee -in -Lieu reduction from 1.05 to 0.75 / bedroom <br />$5,000 / parking space <br />Code SMTX: Parkin Fee -in -Lieu reduction from 0.75 to 0.50 / bedroom <br />$10,000 / parking space <br />Code SMTX: Parkland Development Fee <br />$400.00 / unit <br />Code SMTX: Parkland Fee -in -Lieu <br />ROW Use Fees <br />$375.00 / sin Ie famil unit <br />$300.00 / multifamily unit <br />Short Term ROW Closure Neighborhood/Non-Profit (24 Hrs or Less) <br />$25.00 application fee <br />Short Term ROW Closure Commercial (24 Hrs or Less) <br />$50.00 application fee <br />Long Term ROW Closure Commercial <br />100.00 application fee + $100.00 / week (per lane per <br />block) <br />Floodplain Fees <br />Floodplain permit application (Single Family) <br />$29.00 <br />Floodplain permit application (Commercial) <br />$168.00 <br />Single Family Infill - City Flood Analysis Fee <br />$1,000.00 <br />Floodplain Development Flood Analysis Review Fee <br />$1,500.00 plus $50 / acre (for acreage within floodplain) <br />" 7.1111 inulluuI 411ra : should Yrd, roundod Lia :1-[o-; in=s>ajir nll wll ollo i iGarnlbell CODE SMTX Fees will be effective following the adoption of Code SMTX <br />
The URL can be used to link to this page
Your browser does not support the video tag.