Laserfiche WebLink
Attachment B - Fee Schedule <br />City of San Marcos Blanco River Flood Reduction Project <br />MIN <br />TASK I - Project Development <br />Item 3 Flood Reduction Alternatives <br />12,0 <br />24.0 <br />8.0 <br />610I <br />F <br />240 <br />4.0 <br />$18,760.00 <br />$120.00 <br />$18.880,00 <br />$000 <br />$0.00 <br />TASK I SUBTOTAL 12.0 0.0 <br />24.0 <br />8.0 <br />60.0 0.0 <br />0.0 24.0 <br />go <br />4.0 <br />$18,760.00 <br />$120.00 <br />518,880.00 <br />TASK 11 - Engineering Feasibility Report & EA <br />Item 2 Engineering Schematic and Cost Estimates <br />all <br />16.0 <br />80 <br />20.0 <br />200 <br />B'D <br />4.0 <br />$11,300.00 <br />$120.00 <br />$11,420.00 <br />$0..00 <br />$0,00 <br />TASK 2SUBTOTAL 8.0 0.0 <br />15.0 <br />8.0 <br />2010 0.0 <br />0.0 20.0 <br />ex <br />4,0 <br />511.300.00 <br />$120-00 <br />$11,420.00 <br />1 <br />$000 <br />$0.00 <br />$000 <br />$0,00 <br />$000 <br />Woo <br />$000 <br />$0.0 <br />TASK 3 SUBTOTAL 00 00 <br />0.0 <br />0.0 <br />0.0 ao <br />0.0 0.0 <br />OX <br />0,0 <br />$0.00 <br />$0.00 <br />$0.00 <br />111011 <br />$0.0 <br />$o go <br />$0.00 <br />$0.1 <br />$0.00 <br />I TASK 4 SUBTOTAL [ 1 0.0 1 0.0 1 0.0 t 0.0 ao 1 00 1 0.0 1 0-0 1 0.0 1 00 I 50,00 I- <br />0.0 1 40,0 <br />TOTAL Estimated <br />HOURLY RATES $190.00 $175.00 $190.00 $160.00 $135:00 $ilo-Go $80,00 $95.00 $75.00 $65M <br />