My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2018-037/approving the Professional Engineering Agreement between the City and Halff Associates Inc. for the Blanco Riverine Community Development Block Grant – Disaster Recovery (CDBG-DR) and Texas Water Development Board (TWDB) Project in the estim
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2018
>
Res 2018-037/approving the Professional Engineering Agreement between the City and Halff Associates Inc. for the Blanco Riverine Community Development Block Grant – Disaster Recovery (CDBG-DR) and Texas Water Development Board (TWDB) Project in the estim
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 11:13:07 AM
Creation date
3/26/2018 11:09:04 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2018-37
Date
3/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV 9.29.17 <br />Professional Firm's Services shall be reasonably accurate and free from material errors or <br />omissions. Professional Firm shall promptly correct any known or discovered error, omission, or other <br />defect in the plans, drawings, specifications, or other services provided by Professional Firm without any <br />additional cost or expense to Owner. <br />Professional Firm shall designate a representative primarily responsible for Professional Firm's <br />Services under this Agreement. The designated representative shall act on behalf of Professional Firm <br />with respect to all phases of Professional Firm's Services and shall be available as required for the benefit <br />of the Project and Owner. The designated representative shall not be changed without prior approval of <br />the Owner, which approval shall not be unreasonably withheld. <br />The Professional Firm shall carry such professional liability and errors and omissions insurance, <br />covering the services provided under this Agreement, with a minimum limit of $1,000,000 each claim <br />and $1,000,000 aggregate. The fees for such insurance will be at the expense of the Professional Firm. <br />The Professional Firm shall deliver a Certificate of Insurance indicating the expiration date, and <br />existence, of the Professional Firm's professional liability insurance before commencement or <br />continuation of performance of the services under this Agreement. <br />ARTICLE 3 <br />THE OWNER'S RESPONSIBILITIES <br />The Owner shall provide the Professional Firm with a full description of the requirements of the <br />Project. <br />The Owner shall furnish surveys, geotechnical reports or other special investigations of the <br />Project site as requested by the Professional Firm and as reasonably necessary for the completion of <br />Professional Firm's Services. The Owner shall furnish structural, mechanical, chemical and other <br />laboratory tests as reasonably required. <br />The Owner will review the Professional Finn's drawings, specifications and other documents of <br />service produced by Professional Firm's in the performance of its obligations under this Agreement <br />(collectively the "Design Documents") as required. Owner will notify Professional Firm of any design <br />fault or defect in Professional Firm's Services or Design Documents of which Owner becomes aware. <br />The Owner shall furnish required information and services and shall render approvals and decisions <br />as expeditiously as necessary for the orderly progress of Professional Firm's Services. <br />The Owner designates Laurie Moyer, as its representatives authorized to act in the Owner's behalf <br />with respect to the Project. The contact information for Owner's representative is listed below: <br />Name: Laurie Moyer, P.E. <br />Title: Director of Engineering and Capital Improvement <br />630 East Hopkins <br />San Marcos, Texas 78666 <br />Ph. 512-393-8130 <br />E-mail: Imoyer@sanmarcostx.gov <br />Page 2 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.