My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2018-037/approving the Professional Engineering Agreement between the City and Halff Associates Inc. for the Blanco Riverine Community Development Block Grant – Disaster Recovery (CDBG-DR) and Texas Water Development Board (TWDB) Project in the estim
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2018
>
Res 2018-037/approving the Professional Engineering Agreement between the City and Halff Associates Inc. for the Blanco Riverine Community Development Block Grant – Disaster Recovery (CDBG-DR) and Texas Water Development Board (TWDB) Project in the estim
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2018 11:13:07 AM
Creation date
3/26/2018 11:09:04 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2018-37
Date
3/20/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Purpose: <br />To prepare a proposal to provide supplementary fluvial geomorphological <br />information and assistance for a section of Blanco River, City of San Marcos, <br />for Halff Associates, Inc. <br />Channel Evaluation Procedure: <br />The procedures for assessing stream stability have been put forth by many <br />but the methodology proposed for this evaluation which has been used for <br />decades and found to include the major steps in analysis of any river project <br />is shown below (after Simons, Li and Associates, 1982 Engineering Analysis <br />of Fluvial Systems): <br />ChaC <br />DitEP 2. Flow ' Re ' gimsfflocid-- Site Specific <br />scliarget Analysis <br />Summary <br />Reach Erosion/ <br />iii i <br />Stability Setbacksl <br />J Channel Desigin <br />I 1 -1 OrptionS I.. -.- <br />FluvialGeorn000logy <br />EngineeringAnaTysis, <br />Combined Analysis <br />=�Ufw <br />While the flow chart indicates the necessary steps in channel evaluation and <br />4-esign, the current project is thought to require four stages in which the <br />2bove will be incorporated. These are: <br />
The URL can be used to link to this page
Your browser does not support the video tag.