My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2018-009/amending the Water and Wastewater impact fees to be charged by the City in connection with new land development under Chapter 86, Article 5, Division 4 of the San Marcos City Code and associated land use assumptions
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2018
>
Ord 2018-009/amending the Water and Wastewater impact fees to be charged by the City in connection with new land development under Chapter 86, Article 5, Division 4 of the San Marcos City Code and associated land use assumptions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2018 3:12:29 PM
Creation date
5/8/2018 3:05:10 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2018-09
Date
4/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2018 Update of the Water and Wastewater <br /> Impact Fees for the City of San Marcos <br /> 5.0 Identified Major Capital Improvement Needs and Costs <br /> Given the projected growth in water and wastewater demands, existing capacity, and the <br /> modeling of infrastructure needs, various additional facilities have been identified to meet the <br /> needs for the next 10 years. The City's 10-year capital need for new capacity totals $101.254 <br /> million for water, mostly associated with new supplies from the Alliance Regional Water <br /> Authority and new water transmission facilities, and $61.075 million for wastewater (see <br /> Appendix D). <br /> Given the growth facing the City in the next ten years, improvements have been <br /> identified for the areas of water supply,pumping, elevated storage, and water transmission. San <br /> Marcos has also identified needed improvements to its wastewater system, including <br /> improvements to the treatment plant, pumping, and wastewater interceptors that would serve <br /> future growth. <br /> Specific projects that accomplish these service capacity goals are identified in Tables 6a <br /> and 6b along with their cost, capacity, unit cost, and allocation of existing and projected demand <br /> to these facilities. A weighted unit cost of service ($ per SU) is then calculated by facility type, <br /> based on the proportionate share of use of existing versus new facility capacity by the growth <br /> anticipated over the next ten years. <br /> City of San Marcos 10 <br /> January 2018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.