Laserfiche WebLink
1. The calculated peak water demand . :: :: . : <br /> --- - -. -: for a new development is to be determined <br /> initially by the applicant and is subject to review and approval by <br /> the director, using best water utility industry and engineering <br /> practices and standards. The director may require an applicant to <br /> provide building plans. plumbing layouts, flow calculations and <br /> other informationto support a request for use of a specific size or <br /> type of water meter. <br /> quantity of service units will be determined by reference to the <br /> service unit computation criteria stated in the attached Schedule 2. <br /> (23) No building permit or utility connection shall be issued if the <br /> applicant cannot verify payment to staff of the appropriate impact <br /> fee and other applicable fees or if existing facilities do not have <br /> actual capacity to provide service to the new connections(s), except <br /> for those entities that are exempted from impact fees as are <br /> specifically set forth herein. <br /> (34) The impact fee shall attach to the property for which the impact fee <br /> was paid and shall not be transferable to other properties or service <br /> units. <br /> (c) Amount to be collected The city shall compute the impact fees for a <br /> new development in the following manner: <br /> (1) The amount of each impact fee shall be determined by multiplying <br /> the number of service units required for the new development by the <br /> impact fee per service unit using the applicable rate in the applicable <br /> schedule. The calculation of peak water demand appropriate size of <br /> •- - ••- - . -- development is subject to review <br /> and approval bythe director, using best water utility industry and <br /> engineering practices and standards. <br /> (2) The amount of each impact fee shall be reduced by any allowable <br /> offsets or credits for that category of capital improvements, in the <br /> manner provided in section 86.300. <br /> (3) The total amount of each impact fee for the new development shall <br /> be calculated and attached to the permit or utility application as a <br /> condition of approval. <br /> (4) Except as otherwise provided by contracts with political <br /> subdivisions, developer's contracts, or wholesale customers, no <br />