Laserfiche WebLink
set forth below. <br /> Section 3305 is amended by adding the following: <br /> 3305.2 Construction Debris/Trash Containment. Contractors shall ensure that <br /> every construction,remodel,repair,or renovation site has a method of containment <br /> for construction debris and trash and debris. The contractor shall ensure that the <br /> leash-and construction debris and trash are is removed from the site on a regular <br /> basis so that the site is maintained in a clean, sanitary, and safe condition at all <br /> times. <br /> 3305.3 Sanitary Facilities. Contractors shall ensure that every construction, <br /> remodel, repair, or renovation site has adequate sanitary facilities for all workers. <br /> The contractor shall ensure that these facilities are kept in a clean and sanitary <br /> condition at all times. <br /> Section-3305.4 Street Cleaning. Adjacent streets to the construction site shall be <br /> maintained and free of dirt, mud, rocks and other construction debris at all times. <br /> Dirt, gravel, etc., shall not be swept, washed, or otherwise deposited into <br /> unprotected storm water conveyance systems. <br /> 3305.5 Spoils piles. Visible (full or partial) spoils piles located within fifty Let of <br /> a public ROW shall not exceed eight feet in height. The City maintains discretion <br /> in the management of spoils pile volume and foot print, which shall be minimized. <br /> Seeding undisturbed portions of the pile is required in accordance with all <br /> ... . . • ! - . .• . All spoils piles shall be utilized on site or removed <br /> from construction sites as soon as possible. While onsite, all piles must be <br /> minimized in height, volume and footprint, and in no case shall piles exceed eight <br /> feet in height. Seeding or covering of undisturbed portions of spoils piles is <br /> required if the piles will not be increased or decreased for more than 14 calendar <br /> days, as specified in TPDES construction stormwater pollution prevention plan <br /> regulations,regardless of the size of the site and/or pile. In no case shall site and/or <br /> building final inspections be approved until all spoils piles have been removed from <br /> construction sites. <br /> 3305.6 Jobsite Management The Building Official shall have approval of all <br /> staging areas for jobsites where there are site constraints that may affect the <br /> surrounding areas. <br /> 3305.7 Truck Routes. The Building Official shall have approval of all truck routes <br /> within the City Limits,used for construction purposes such as excavation transport, <br /> ready-mix pour, etc. <br />