My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2018-013/adopting fees to be charged by the City for various city services, including changes to some existing fees and the addition of new fees
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2018
>
Ord 2018-013/adopting fees to be charged by the City for various city services, including changes to some existing fees and the addition of new fees
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 1:34:04 PM
Creation date
6/4/2018 2:53:10 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2018-13
Date
5/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
S 4TA M11e'kb44'C}S <br />J <br />Site Fees <br />Watershed Protection <br />Watershed Protection Plan Phase <br />$800.00 <br />Watershed Protection Phase II (with or without Site Prep) <br />Public Improvement Construction <br />1$1,2UU.UU plus $50.00 /acre ($3,000 max) <br />Plans (PICP) <br />Subdivision Improvements including more than one type of Infrastructure <br />(includes the entire limits of construction) <br />$2,250.00 plus $50.00 /acre ($4,000 max) <br />Individual Transportation or Utility Infrastructure Extensions (not to exceed the fee <br />for more than one type of infrastructure) <br />$1,117.00 plus $5 per linear ft of each improvement <br />Out of City Utility Extension <br />$750 <br />Out of City Utility Connection <br />$0 <br />Weekend & After Hours Public Improvement Inspection <br />Site Preparation <br />$100.00/hour, 4 hour minimum <br />Site Preparation (requires engineer) (does not include WPP review) <br />$1,700.00 plus $50.00 / acre <br />Small Site Preparation <br />$300.00 <br />Permit to install on-site sewage disposal system <br />$178.00 <br />Traffic Impact Analysis (TIA) <br />$750.00 <br />TIA (Worksheet) <br />$112.00 <br />CLOMR or LOMR without approved CLOMR <br />$2,500.00 <br />LOMR (with approved CLOMR) <br />$1,500.00 <br />LOMA <br />Driveway/Sidewalk Permit <br />1$500.00 <br />Residential (Type I) Driveway or Sidewalk <br />$29.00 <br />Commercial (Type II) Driveway or Sidewalk <br />I$bb.UO <br />ROW Maintenance/ Improvement Permit <br />Other <br />15% of project value ($55.00min/$2,200.00 max) <br />My Permit Now Technology Fee (applied to all permits) <br />$11.00 <br />On -premise signs <br />$2.50 per square ft ($50 min) <br />Off -premise signs / billboards <br />$280.00 <br />Common Signage Plan <br />$280.00 <br />Fence permit Fee <br />$56.00 <br />Resubmittal Fee (All Permit Types) <br />$280.00 each resubmittal after the second <br />Reinspection Fee (2nd and subsequent inspections) <br />Residential $55.00 <br />Commercial $250.00 <br />Multi -Family $300.00 <br />Additional fee after 2nd Reinspection $100.00 <br />Sidewalk Fee -in -Lieu <br />$6.00 per square ft <br />Protected Trees Fee in Lieu <br />$153.00 per Caliper Inch <br />Heritage Tree Fee in Lieu <br />$305.00 per Caliper inch <br />Code SMTX: Water Quality Fee -in -Lieu <br />$14,629 / acre ($0.34 / square foot) <br />Code SMTX: Detention Fee -in -Lieu <br />$7.35 / sq. ft. (up to 7,000 sq. ft. impervious cover) <br />$4.77 / sq. ft. (7,001-28,000 sq. ft. impervious cover) <br />$2.50 / sq. ft. (28,001-68,000 sq. ft. impervious cover) <br />$1.65 / sq. ft. (68001-100,000 sq. ft. impervious cover) <br />$1.00 / sq. ft. (over 100,001 sq. ft. impervious cover) <br />Code SMTX: Parking Fee -in -Lieu (reduction from 1.05 to 0.75 / bedroom) <br />$5,000 / parking space <br />Code SMTX: Parking Fee -in -Lieu (reduction from 0.75 to 0.50 / bedroom) <br />$10,000 / parking space <br />Code SMTX: Parkland Development Fee <br />$400.00 / unit <br />Code SMTX: Parkland Fee -in -Lieu <br />ROW Use Fees <br />$375.00 single family unit <br />/ <br />$300.00 / multifamily unit <br />Short Term ROW Closure N eighbo rhood/Non- Profit (24 Hrs or Less) <br />$25.00 application fee <br />Short Term ROW Closure Commercial (24 Hrs or Less) <br />$50.00 application fee <br />Long Term ROW Closure Commercial <br />$100.00 application fee + $100.00 / week (per lane per <br />block) <br />Newsrack Application Fee <br />50 per location, per publication <br />Newsrack Renewal Fee (Every 3 years) <br />$50 per location, per publication <br />Small Cell Application Fee <br />$500 per 5 network nodes, $250 each additional network <br />node <br />Small Cell Pole Application Fee <br />Floodplain Fees <br />$1000 per pole <br />Floodplain permit application (Single Family) <br />$29.00 <br />Floodplain permit application (Commercial) <br />$168.00 <br />Single Family Infill - City Flood Analysis Fee <br />$1,000.00 <br />Floodplain Development Flood Analysis Review Fee <br />$1,500.00 plus $50 / acre (for acreage within floodplain) <br />All multipliers should be rounded to the nearest whole number <br />
The URL can be used to link to this page
Your browser does not support the video tag.