Laserfiche WebLink
S 4TA M11e'kb44'C}S <br />J <br />Site Fees <br />Watershed Protection <br />Watershed Protection Plan Phase <br />$800.00 <br />Watershed Protection Phase II (with or without Site Prep) <br />Public Improvement Construction <br />1$1,2UU.UU plus $50.00 /acre ($3,000 max) <br />Plans (PICP) <br />Subdivision Improvements including more than one type of Infrastructure <br />(includes the entire limits of construction) <br />$2,250.00 plus $50.00 /acre ($4,000 max) <br />Individual Transportation or Utility Infrastructure Extensions (not to exceed the fee <br />for more than one type of infrastructure) <br />$1,117.00 plus $5 per linear ft of each improvement <br />Out of City Utility Extension <br />$750 <br />Out of City Utility Connection <br />$0 <br />Weekend & After Hours Public Improvement Inspection <br />Site Preparation <br />$100.00/hour, 4 hour minimum <br />Site Preparation (requires engineer) (does not include WPP review) <br />$1,700.00 plus $50.00 / acre <br />Small Site Preparation <br />$300.00 <br />Permit to install on-site sewage disposal system <br />$178.00 <br />Traffic Impact Analysis (TIA) <br />$750.00 <br />TIA (Worksheet) <br />$112.00 <br />CLOMR or LOMR without approved CLOMR <br />$2,500.00 <br />LOMR (with approved CLOMR) <br />$1,500.00 <br />LOMA <br />Driveway/Sidewalk Permit <br />1$500.00 <br />Residential (Type I) Driveway or Sidewalk <br />$29.00 <br />Commercial (Type II) Driveway or Sidewalk <br />I$bb.UO <br />ROW Maintenance/ Improvement Permit <br />Other <br />15% of project value ($55.00min/$2,200.00 max) <br />My Permit Now Technology Fee (applied to all permits) <br />$11.00 <br />On -premise signs <br />$2.50 per square ft ($50 min) <br />Off -premise signs / billboards <br />$280.00 <br />Common Signage Plan <br />$280.00 <br />Fence permit Fee <br />$56.00 <br />Resubmittal Fee (All Permit Types) <br />$280.00 each resubmittal after the second <br />Reinspection Fee (2nd and subsequent inspections) <br />Residential $55.00 <br />Commercial $250.00 <br />Multi -Family $300.00 <br />Additional fee after 2nd Reinspection $100.00 <br />Sidewalk Fee -in -Lieu <br />$6.00 per square ft <br />Protected Trees Fee in Lieu <br />$153.00 per Caliper Inch <br />Heritage Tree Fee in Lieu <br />$305.00 per Caliper inch <br />Code SMTX: Water Quality Fee -in -Lieu <br />$14,629 / acre ($0.34 / square foot) <br />Code SMTX: Detention Fee -in -Lieu <br />$7.35 / sq. ft. (up to 7,000 sq. ft. impervious cover) <br />$4.77 / sq. ft. (7,001-28,000 sq. ft. impervious cover) <br />$2.50 / sq. ft. (28,001-68,000 sq. ft. impervious cover) <br />$1.65 / sq. ft. (68001-100,000 sq. ft. impervious cover) <br />$1.00 / sq. ft. (over 100,001 sq. ft. impervious cover) <br />Code SMTX: Parking Fee -in -Lieu (reduction from 1.05 to 0.75 / bedroom) <br />$5,000 / parking space <br />Code SMTX: Parking Fee -in -Lieu (reduction from 0.75 to 0.50 / bedroom) <br />$10,000 / parking space <br />Code SMTX: Parkland Development Fee <br />$400.00 / unit <br />Code SMTX: Parkland Fee -in -Lieu <br />ROW Use Fees <br />$375.00 single family unit <br />/ <br />$300.00 / multifamily unit <br />Short Term ROW Closure N eighbo rhood/Non- Profit (24 Hrs or Less) <br />$25.00 application fee <br />Short Term ROW Closure Commercial (24 Hrs or Less) <br />$50.00 application fee <br />Long Term ROW Closure Commercial <br />$100.00 application fee + $100.00 / week (per lane per <br />block) <br />Newsrack Application Fee <br />50 per location, per publication <br />Newsrack Renewal Fee (Every 3 years) <br />$50 per location, per publication <br />Small Cell Application Fee <br />$500 per 5 network nodes, $250 each additional network <br />node <br />Small Cell Pole Application Fee <br />Floodplain Fees <br />$1000 per pole <br />Floodplain permit application (Single Family) <br />$29.00 <br />Floodplain permit application (Commercial) <br />$168.00 <br />Single Family Infill - City Flood Analysis Fee <br />$1,000.00 <br />Floodplain Development Flood Analysis Review Fee <br />$1,500.00 plus $50 / acre (for acreage within floodplain) <br />All multipliers should be rounded to the nearest whole number <br />