Laserfiche WebLink
cs.i # <br />­ Local....Gove� � � <br />Government <br />...... _ ......__.. ......... <br />� . ��������� <br />... <br />0016-09-040 and 0366-01-079 <br />CSJ # <br />2. <br />District # <br />14 -AUS <br />.... ......... _.....___.... <br />......... ...._................................... ................ .. <br />Code Chart 64 # <br />37950 <br />_ m <br />Pro,ec.......... <br />Name <br />........t ......... <br />Loo 82 Improve P ............. _ ............................ <br />ment-Phase I <br />AGREEMENT <br />Responsible Parties: <br />The parties shall be responsible for the following work as stated in the article of the Agreement <br />referenced in the table below: <br />1.������ <br />.... <br />­ Local....Gove� � � <br />Government <br />...... _ ......__.. ......... <br />� . ��������� <br />... <br />.___ _ ......__._._ . ............. �.______.__. _ .._... <br />Utilities <br />..... ......... <br />___.....___._ _ .............. <br />Article 8 <br />2. <br />State <br />.._LocaL...Governmen.t .......... <br />.�.....Architectural......___,_,.,.... <br />........... ......... . ......... ......... <br />Environmental Assessment and Mitigation <br />Article 9 <br />3. <br />.... ....__ <br />_ .... _.. ..........__ <br />and Engineering Services <br />....... __ ...._.._ ..._... ....�. <br />... ....._........... <br />Article 12 <br />4. <br />Local...Governme <br />Government <br />......... ........_ ......... ........ <br />_ <br />.......... ...... .. ..... <br />Construction Responsibilities <br />.... ...._ ....... <br />_ ......._.... <br />Article 13 <br />5. <br />Local Government <br />_ ........._. . ...... ....... _� ...._...... <br />Right of Way and Real Property <br />. ........ _. <br />Article 15 <br />2. Period of the Agreement <br />This Agreement becomes effective when signed by the last party whose signing makes the <br />Agreement fully executed. This Agreement shall remain in effect until the Project is completed <br />or unless terminated as provided below. <br />3. Scope of Work <br />Phase -1 of the development of SL 82(S. Guadalupe Street) from University Drive to Grove <br />Street, which include bike lanes, parking, pedestrian signals and signs. <br />4. Project Sources and Uses of Funds <br />The total estimated cost of the Project is shown in Attachment C, Project Budget, (Attachment <br />C) which is attached to and made a part of this Agreement. <br />A. If the Local Government will perform any work under this Agreement for which <br />reimbursement will be provided by or through the State, the Local Government must <br />complete training. Training is complete when at least one individual who is working <br />actively and directly on the Project successfully completes and receives a certificate for <br />the course entitled "Local Government Project Procedures and Qualification for the <br />Texas Department of Transportation" and retains qualification in accordance with <br />applicable TxDOT procedures. Upon request, the Local Government shall provide the <br />certificate of qualification to the State. The individual who receives the training <br />certificate may be an employee of the Local Government or an employee of a firm that <br />has been contracted by the Local Government to perform oversight of the Project. The <br />State in its discretion may deny reimbursement if the Local Government has not <br />continuously designated in writing a qualified individual to work actively on or to directly <br />oversee the Project. <br />B. The expected cash contributions from the State, the Local Government, or other <br />parties are shown in Attachment C. The State will pay for only those Project costs that <br />have been approved by the Texas Transportation Commission. <br />C. Attachment C shows, by major cost categories, the cost estimates and the party <br />responsible for performing the work for each category. These categories may include <br />but are not limited to: (1) costs of real property; (2) costs of utility work; (3) costs of <br />Page 2 of 12 <br />AFA NonFed LongGen Rev. 11/20/2017 <br />