My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-049/approving an agreement with Texas Transportation Alliance, LLC that provides for economic development incentives for the planning, design, and development of a rail-served commercial and industrial park, known as the SMART Terminal project,
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-049/approving an agreement with Texas Transportation Alliance, LLC that provides for economic development incentives for the planning, design, and development of a rail-served commercial and industrial park, known as the SMART Terminal project,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 10:22:33 AM
Creation date
3/26/2019 9:30:16 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-49
Date
3/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Job Nn.:|U5e*2 <br />214.131 Acres <br />Page zu/c <br />S4U'58|0"S,udistance n[2944.25feet mupoint; <br />Y«49"33'05"I\odistance of48624feet mapoint; <br />S |3"49'09''E.0distance n[d54.Q7feet mopoint; <br />S \6"|Z)0'8,udistance n[819.38feet mupoint; <br />S49`26'24"W(odistance o[2OU720feet mupoint; <br />N41'04'03^9( udiotance of 4259.27 feet to the POINT OPBEGINNING and <br />con:ainin�214.l31acres inthe Caldwell Cnunt�Toxm.3�d�u /hcingdvoohbnd <br />in conjunction with an exhibit prepared under job number 11152'02 by Pape - <br />Dawson Engineers, Inc. <br />"This document was prepared Linder 22TAC663.21, does not reflect the results of <br />an on the ground survey, and i, not to be used to convey or establish iomncym in <br />real property except those rights and interests implied nrestablished bythe creation <br />or reconfiguration of the boundary of the yu|ibcu| subdivision for which it was <br />prepared," <br />PREPARED BY: Pape -Dawson Engineers, Inc. <br />DATE: December 3.2*|o <br />JOB NO. ||ozoz <br />ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.