Laserfiche WebLink
26. Background Inforination: <br />The Upper San Marcos River segment (Segment 1814) is 4.5 miles long and extends from Spring Lake to its <br />confluence with the Blanco River. The River is primarily spring -fed and receives periodic inputs of <br />stormflow from four major tributaries. This segment of the river is classified for contact recreation, <br />exceptional aquatic life use, drinking water supply for downstream users, and is home to five federally listed <br />endangered species. The City of San Marcos and Texas State University have seen unprecedented growth <br />over the past decade. Growth in the watershed and the surrounding area is rapidly changing land use, <br />putting pressure on surface water quality and groundwater resources. Sampling data show that water quality <br />in Spring Lake and the Upper San Marcos River decline after storm flow events, especially with regard to <br />total suspended solids (TSS) and nutrients. Elevated levels of bacteria in the river and its tributaries are also <br />associated with stormflow. <br />In 2010, the Upper San Marcos River was cited on TCEQ's 303(d) list of impaired waterways for exceeding <br />TDS water quality standards. Several other pollutants have also been identified as a concern by stakeholders <br />in the watershed. Because the Upper San Marcos River is spring -fed and has exceptional water quality, <br />stakeholders identified target levels that are more stringent than the state standards and screening levels in <br />order to protect the river. These water quality targets are part of the Upper San Marcos River WPP. The <br />WPP, known locally as the San Marcos Watershed Initiative (SMWI), addresses TDS, E. coli, nutrients, <br />sediment, and other pollutants associated with future growth and development. <br />This WPP is unique in that it was developed in coordination with several other significant watershed -level <br />water quality protection efforts, including a regional Habitat Conservation Plan, City- and University -led <br />Water Quality Protection Plan, City -led Comprehensive Watershed Master Plan and City and University <br />MS4 permitting process. The SMWI Stakeholders worked together to weave these efforts into a holistic <br />management plan to restore and protect water quality in the Upper San Marcos River, complete with long <br />term technical implementation schedules, coordinated educational efforts, and funding strategies. These <br />interwoven initiatives will ensure funding and support for implementation of the WPP. Stakeholders <br />selected a suite of structural and non-structural BMPs to mitigate current and future potential water quality <br />impairments in the watershed. A subset of these BMPs was prioritized for immediate implementation, while <br />others will be implemented over a number of years, as required to mitigate nonpoint source pollution from <br />future development and other activities in the watershed. <br />27. General Project Description: <br />The SMWI began in 2012 as a multi-year process of research and information gathering with the end goal <br />of implementing a community -approved and federally -accepted WPP for the Upper San Marcos River. <br />The Meadows Center for Water and the Environment and SMWI stakeholders compiled and collected <br />relevant data, identified potential sources of nonpoint source pollution and modeled water quality for <br />existing and predicted future land use conditions. This information was used to prioritize potential <br />locations for implementing selected BMPs over time to preserve water quality (TDS, TSS, nutrients and <br />bacteria) throughout the watershed including: <br />0 Structural BMPs for new developments and retrofits for existing development (Task 3) <br />0 Demonstration projects to encourage adoption of water quality protection practices (Task 3) <br />0 Education and Outreach Strategies (Task 4) <br />0 Analysis and improvement of Codes & Regulations impacting water quality (Task 5) <br />0 Information gathering to address remaining data gaps (Task 6) <br />The SMWI stakeholders selected a suite of BMPs to mitigate future potential water quality impairments in <br />the watershed, a subset of these BMPs was prioritized for immediate implementation. The first <br />Implementation Phase will include functional demonstration projects/BMPs, education and outreach <br />activities, review of water quality protection ordinances, and coordination of water quality monitoring <br />activities. These efforts will lead to a modest reduction in NPS pollution (and likely a corresponding <br />improvement in instream concentrations of pollutants) but, more importantly, they will serve as <br />demonstrations, pilots, and educational resources to ensure that the WPP is fully implemented in the <br />coming years. The Stakeholder Committee will play an active role in education and outreach, as well as in <br />determining if the WPP implementation is successful, through the tracking of milestones and objectives. <br />BMPs installed during Implementation Phase I will serve as demonstrations highlighting the effectiveness <br />of BMPs to water resource managers, community leaders, developers, and citizens. Demonstrations will <br />include preventative, stormwater, and LID measures, and will provide critical cost and pollution <br />reduction information to the City and University regarding future implementation of additional <br />Page n of 27 <br />