Laserfiche WebLink
dumpers <br />• Underfrequency relay panel <br />10. Operational Responsibilities of Each Party: Each Party will be responsible for the <br />operation of the equipment it owns. LCRA TSC shall operate the SMEU 138 -kV <br />equipment, including monitoring the SMEU power transformer alarms. <br />11. Maintenance Responsibilities of Each Party: Each Party will be frilly responsible for <br />the maintenance of the equipment it owns. <br />12. Other Terms and Conditions <br />• SMEU and LCRA TSC are to share access to the substation by LCRA TSC locks <br />in the gate and in the control house doors. <br />• SMEU will provide LCRA TSC access to 125 VDC and 120 VAC power. <br />Circuits must have over current protection devices (OCPD) sized according to <br />NEC standards. Panel boards containing the OCPD may belong to either SMEU <br />(if space is available) or LCRA TSC. <br />• SMEU will provide LCRA TSC with floor space (as available and as necessary) <br />in its control houses for the installation of LCRA TSC required relay panel boards <br />and equipment. <br />• SMEU shall supply and provide metering current transformers from power <br />transformer T2 for LCRA TSC metering. <br />• SMEU shall supply and provide 12.5 -kV bus potential transformer PT2 for LCRA <br />TSC metering. <br />• LCRA TSC and SMEU shall design, provide, and coordinate their respective <br />protection system equipment so that adjacent zones of protection overlap, in <br />accordance with ERCOT Nodal Operating Guides. <br />-----The remainder of this page has intentionally been left blank----- <br />LCRA TSC — San Marcos Electric Utility Amendment No. 1 Page 12 of 13 <br />