My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-057/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) which includes, among other items, the addition of a Mobile Transformer Tap at the Ranch Road 23 Substation; approving a
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-057/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) which includes, among other items, the addition of a Mobile Transformer Tap at the Ranch Road 23 Substation; approving a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 12:56:54 PM
Creation date
4/29/2019 10:07:26 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-57
Date
4/2/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACILITY SCHEDULE NO. 1 <br />1. Name: Hilltop Substation <br />2. Facility Location: The Hilltop Substation is located at 321 Lamar Ave., San Marcos, Hays <br />County, Texas. <br />3. Points of Interconnection: There are two (2) Points of Interconnection in the Hilltop <br />Substation generally described as: <br />• where the jumper from LCRA TSC's 138 -kV operating bus connects to SMEU's <br />switch 2554 <br />• where the jumper from LCRA TSC's 138 -kV operating bus connects to SMEU's <br />switch 9554 <br />4. Transformation Services Provided by LCRA TSC: No <br />5. Metering Services Provided by LCRA TSC: Yes, per separate Wholesale Metering <br />Service Agreement <br />6. Delivery Voltage: 138 -kV <br />7. Metered Voltage and Location: The metered voltage is 12.5 -kV. The metering current <br />transformers are located in bay 2 and bay 4 of the distribution system and in power <br />transformer T2. The metering potential transformers are located on the 12.5 -kV operating <br />buses. <br />8. One Line Diagram Attached: Yes <br />9. Description of Facilities Owned by Each Party: <br />San Marcos Electric Utilities owns: <br />The Hilltop Substation <br />• Two (2) power transformers T1 and T2 with associated surge arresters, and <br />protective relaying <br />• Two (2) circuit switchers CS2555 and CS9555 with 138 -kV disconnect switch <br />2554 and 9554 <br />• One (1) circuit switcher bypass switch 9557 <br />• All distribution circuit breakers <br />• 12.5-1cV steel structures, 12.5 -kV operating and transfer buses, switches, insulators, <br />fused cutouts, and distribution class surge arresters <br />• One (1) 12.5-1cV bus tie switch HI65 <br />• One (1) 12.5 -kV potential transformer PT2 with fuse F8 <br />• One (1) load management system LM <br />LORA TSC — San Marcos Electric Utility Amendment No. 1 Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.