Laserfiche WebLink
• LCRA TSC will provide SMEU with floor space (as available and as necessary) <br />in its control houses for the installation of SMEU required relay panel boards and <br />equipment. <br />• SMEU shall supply and provide metering current transformers from power <br />transformer T2 for LCRA TSC metering. <br />• SMEU shall supply and provide 12.5 -kV bus potential transformer PT2 for LCRA <br />TSC metering. <br />• LCRA TSC will provide tripping and close inhibit contacts from LCRA TSC's <br />138 -kV differential & breaker failure relaying panel to SMEU's circuit switcher <br />CS2555 relaying panel. <br />• LCRA TSC will provide tripping and close inhibit contacts from LCRA TSC's <br />138 -kV bus differential & breaker failure relaying panel to SMEU's circuit <br />switcher CS9555 relaying panel. <br />• SMEU will provide breaker failure initiate contacts from SMEU's 138 -kV circuit <br />switcher CS2555 relaying panel to LCRA TSC's 138-1cV-bus differential & <br />breaker failure relaying panel. <br />• SMEU will provide breaker failure initiate contacts from SMEU's 138 -kV circuit <br />switcher CS9555 relaying panel to LCRA TSC's 138 -kV bus differential & <br />breaker failure relaying panel. <br />• SMEU will supply and provide relaying current transformers from SMEU's <br />Transformer T2 for use by LCRA TSC in LCRA TSC's 138 -kV bus differential <br />relaying scheme. <br />• LCRA TSC and SMEU shall design, provide, and coordinate their respective <br />protection system equipment so that adjacent zones of protection overlap, in <br />accordance with ERCOT Nodal Operating Guides. <br />-----The remainder of this page has intentionally been left blank----- <br />LCRA TSC — San Marcos Electric Utility Amendment No. I Page 6 of 13 <br />