My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-090/approving and Interlocal Agreement with the Capital Area Metropolitan Planning Organization relating to a Platinum Planning Study to enhance Multimodal Transportation in the City of San Marcos and Capital Area
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-090/approving and Interlocal Agreement with the Capital Area Metropolitan Planning Organization relating to a Platinum Planning Study to enhance Multimodal Transportation in the City of San Marcos and Capital Area
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 12:54:01 PM
Creation date
5/31/2019 2:41:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-90
Date
5/21/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Capital Area MPO and City of San Marcos Platinum Planning Study <br />8. Draft recommendations and strategies outlined above. Recommended <br />concept for future development with integrated transportation <br />concepts. <br />9. A minimum of five ground level and/or bird's eye view artistic renderings and/or <br />computer-generated photo simulations of (transportation) improvement <br />concepts to help the public visualize recommended improvements of <br />significance. <br />10. Suggested strategies to influence development toward achieving the concept plan. <br />11. Recommended near, short, medium, and long-term transportation projects to improve <br />mobility in the study area. <br />12. Benefit cost analysis for each recommended project. <br />13. Identification of potential funding sources for each recommended project. <br />14. Base maps showing the location, layout, and typical sections for each concept <br />considered (one high resolution, reproducible digital copy). <br />15. Executive Summary of the study report with its high resolution, reproducible digital <br />copy, not to exceed five pages. (Word and PDF format). <br />16. Catalytic project and center implementation marketing brief with its high resolution, <br />reproducible digital copy, not to exceed two pages (Word and PDF format), for use in <br />future development/redevelopment efforts. <br />17. All associated supporting documents located in the appendices. <br />18. Final Draft and Draft Study incorporating all deliverables from Tasks 1-5, unless <br />otherwise directed <br />19. Twenty-five (25) Hard Copies in Color of the Final Report, Fifty (50) Hard Copies in Color <br />of the Executive Summary, and Ten (10) Hard Copies in Color of the Appendices. Final <br />Report should be in 8.5' X 11' format. <br />20. All GIS, Photoshop, InDesign, Illustrator, MSWord, MS Excel, photo, graphics and other <br />associated files. <br />21. Any additional content deemed necessary by the Capital Area MPO. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.