Laserfiche WebLink
FY 2019 CIP Project List <br />5/16/2019 <br />Project ID <br />Project Name <br />Fund <br />FY 19 Debt Sale <br />3 <br />Traffic Signal Synchronization and Improvement Project <br />General <br />$ 125,000 <br />c583 <br />Transportation Oversize <br />General <br />$ 100,000 <br />C743 <br />Rio Vista Falls Repair <br />General <br />$ 500,000 <br />C627 <br />Belvin Street Improvements <br />Stormwater <br />$ 130,000 <br />C183 <br />Bishop Street Improvements <br />Stormwater <br />$ 300,000 <br />C680 <br />Castle Forest Channel <br />Stormwater <br />$ 250,000 <br />C521 <br />Sessom Creek Bank Stabilization And Wastewater Replacement From N.LBJ to Canyon Road <br />Stormwater <br />$ 150,000 <br />C33 <br />Cottonwood Creek Detention Study <br />Stormwater <br />$ 250,000 <br />C358 <br />Downtown Smartcode Water Quality Plan Implementation <br />Stormwater <br />$ 100,000 <br />C582 <br />E. Aquarena Springs Drive Reconstruction <br />Stormwater <br />$ 50,000 <br />C90 <br />Hopkins Street Improvements Project (Bishop to Moore) <br />Stormwater <br />$ 2,500,000 <br />Hwy 123 12" Water AC Line Replacement <br />Stormwater <br />$ 50,000 <br />C629 <br />IH -35 Utility Relocations <br />Stormwater <br />$ 125,000 <br />C563 <br />Linda Drive Improvements <br />Stormwater <br />$ 300,000 <br />C557 <br />CM Allen <br />Stormwater <br />$ 133,000 <br />C621 <br />River Ridge Stormwater Imps <br />Stormwater <br />$ 270,000 <br />C210 <br />Stormwater System Improvements <br />Stormwater <br />$ 120,000 <br />C644 <br />Sunset Acres Subdivision Study <br />Stormwater <br />$ 500,000 <br />C618 <br />Various Stormwater Imps <br />Stormwater <br />$ 200,000 <br />c244 <br />Wastewater Improvements <br />Wastewater <br />$ 150,000 <br />C627 <br />Belvin Street Improvements <br />Wastewater <br />$ 75,000 <br />C183 <br />Bishop Street Improvements <br />Wastewater <br />$ 150,000 <br />2 <br />City Hall Reconstruction <br />Wastewater <br />$ 10,000 <br />