Laserfiche WebLink
Streets <br /> Project Name (20) River Ridge Extension to 21 Project Cost: $ 24,014,300 <br /> Project Description <br /> Extend River Ridge to SH21 as initial 2 lane with bike lanes and sidewalks in 90' ROW, <br /> providing direct connection from 135 to airport and relieve Hwy 80 <br /> Project Name (21) River Road RR Overpass Imp Project Cost: $ 30,477,000 <br /> Project Description <br /> Construct railroad overpass to provide enhanced mobility. Improve alignment and provide <br /> alternate energency access to a flood prone area. <br /> Project Name (22) RR 12 Widen Hughson-Holland Project Cost: $ 6,345,000 <br /> Project Description <br /> Construct center turn lane between Hughson and Holland. <br /> Project Name (23) Sessom Reconstruction Project Cost: $ 1,636,250 <br /> Project Description <br /> Reconstruct Sessom from Aquarena Springs to Academy. Includes drainage, guard railes <br /> and sidewalks <br /> Project Name (24) SH 21 SM River Bridge <br />Project Description Project Cost: $ 20,723,000 <br /> Construct a 4 lane bridge across the San Marcos River to extend SH21 south as an <br /> alternative regional reliever for 135 <br /> Project Name (25) Sidewalks Along Chestnut Project Cost: $ 237,500 <br /> Project Description <br /> Construction of 2,800 ft. of sidewalk between LBJ and Holland <br /> Project Name (26) Thorpe Hopkins Imp Project Cost: $ 3,439,000 <br /> Project Description <br /> Construct additional eastbound lane between Charles Austin and the RR to provide dual left <br /> turn lanes and two through lanes from Hopkins onto Thorpe. Construct a right turn lane <br /> westbound Hopkins onto Thorpe. Construct center turn lane on Thorpe between Hopkins <br /> and Springtown Way. RElocate signal from Robbie to Springtown Way. <br /> Project Name (27) Traffic Calming Project Cost: $ 226,250 <br /> Project Description <br /> Establish funding for traffic calming devices such as speed cushions, chicanes and <br /> diverters. <br /> Project Name (28) Transportation Imp Project Cost: $ 2,420,481 <br /> Project Description <br /> Participating in ooversizing of transportation improvements