Laserfiche WebLink
Wastewater <br />0 Project Name (28) Southeast WWPT Project Cost: $ 35,789,840 <br /> <br /> Project Description <br /> Construct first 4 mgd of a future 8 mgd plant with peak flow of 19.5 mgd on east side along <br /> Cottonwood Creek east of Old Bastrop <br /> Project Name (29) SSES & Repairs Project Cost: $ 5,485,500 <br /> Project Description <br /> Sanitary sewer evaluation study and correction of defects. <br /> Project Name (30) Thorpe Lane Improvements Project Cost: $ 1,570,000 <br /> Project Description <br /> Improve all wastewater lines near Thorpe Lane. <br /> Project Name (31) Victory Gardens WW Project Cost: $ 2,512,600 <br /> Project Description <br /> Repair existing deteriorating lines in neighborhood. <br /> Project Name (32) Wallace Addition WW Project Cost: $ 1,340,900 <br /> <br />• Project Description <br />Repair existing deteriorating lines in neighborhood. <br /> <br /> Project Name (33) Wastewater Master Plan Project Cost: $ 1,098,550 <br /> Project Description <br /> 7 year update; evaluate system needs and opportunities, identifying future projects <br /> Project Name (34) Wet Weather Imp to WWTP Project Cost: $ 1,911,120 <br /> Project Description <br /> Construct additional final clarifier, aeration basin and upgrade to the UV system to handle <br /> wet weather flows <br /> Project Name (35) Willow Creek WW Ph 1 Project Cost: $ 3,369,500 <br /> Project Description <br /> Construct lines in Ridge at Willow Creek and Willow Creek 3 & 6, and portions of Willow <br /> Creek 4 to allow connection as septics begin to fail <br /> Project Name (36) Willow Creek WW Phase 2 Project Cost: $ 2,803,70C <br /> Project Description <br /> Construct lines and lift station to serve sections 8, 9, 10A & B, remainder of 4 & 7, and <br /> Ridge at Willow Creek 2 and Ridge at Stone Cliff <br />?I <br />U