Laserfiche WebLink
Water <br />0 Project Name (1) 24" Main Sprink Lake to Com <br />Project Description <br />line from Spring lake to Comanche <br />Project Name (2) Airport 12-inch Water <br />Project Description <br />line from airport entrance to William Pettus <br />Project Name (3) Camino Real Phase 3B <br />Project Description <br />Distribution main between McCarty and Centerpoint to connect SWTP with southeast <br />segment of water service area <br />Project Name (4) Centerpoint 12" Distrib Line <br />Project Description <br />Distribution line along Centerpoint from Old Bastrop to Southridge Estates <br />Project Name (5) Centerpoint Rd 24"Main <br />Project Description <br />transmission line along Centerpoint from Old Bastrop to IH35 to serve outlet mall <br />Project Name (6) Comanche W - Hutchison to MLK <br />Project Description <br />replace failing main <br />Project Name (7) Comprehensive Plan <br />Project Description <br />Enlarge study area to include new ETJ & SH130, changing growth patterns, land use <br />assumptions, growth projects and goals <br />Project Name (8) Cottonwood Creek Parkway Water <br />Project Description <br />Construct 8,300 If of 12" water line <br />Project Name (9) Deerwood Sleepy Hollow <br />Project Description <br />Replace undersized mains <br />Project Name (10) Dunbar Water Replacement <br />Project Cost: $ 2,429,950 <br />Project Cost: $ 1,706,000 <br />Project Cost: $ 1,130,000 <br />Project Cost: $ 1,150,000 <br />Project Cost: $ 1,359,185 <br />Project Cost: $ 138,000 <br />Project Cost: $ 207,000 <br />Project Cost: $ 1,930,000 <br />Project Cost: $ 8,803,365 <br />Project Cost: $ 1,706,600 <br />• Project Description <br />Replace undersized mains