My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water <br />0 Project Name (21) Loop Miscellaneous Mains <br />Project Description <br />Loop various mains throughout the city to eliminate the need for flushing and improve <br />service. <br />Project Name (22) Main Extensions <br />Project Description <br />Replace mains through leak detection and maintenance records. <br />Project Name (23) McCarty Tank Improvements <br />Project Description <br />Improve existing pumps to boost water to the 936 pressure plane. <br />Project Name (24) McCarty Water Ph 3 <br />Project Description <br />Line from 135 to Old Bastrop parallel to McCarty <br />Project Name (25) Mockingbird Hills Subdivision Improvements <br />Project Description <br />Improve approx. 4,000 If of existing water mains <br />Project Name (26) RR 12 Main for Edwards Aquifer Customers <br />Project Description <br />Construct 5501f of 8" main to service new customers along RR 12 currently served by <br />Edwards Aquifer wells. Construct 9001f of 8" main to srevice new customers along Country <br />Estates currently served by Edwards Aquifer wells <br />Project Name (27) Northside Elevated Tank <br />Project Description <br />Construct 0.51VI gallon elevated storage tank in north area of the City for TCEQ compliance <br />Project Name (28) Oakridge Booster Pump Station <br />Project Description <br />Upgrade pump to TCEQ requirement <br />Project Name (29) Old Bastrop Hwy W Ph 1 <br />Project Description <br />Construct 16" line in Old Bastrop from Centerpoint to Posey <br />Project Name (30) Old Bastrop Hwy. W. Ph. 2 <br />Project Description <br />Construct a 12" water line from Posey to Francis Harris <br />Project Cost: $ 800,000 <br />Project Cost: $ 2,394,200 <br />Project Cost: $ 970,000 <br />Project Cost: $ 1,880,000 <br />Project Cost: $ 530,000 <br />Project Cost: $ 300,000 <br />Project Cost: $ 1,830,000 <br />Project Cost: $ 172,500 <br />Project Cost: $ 1,109,290 <br />Project Cost: $ 755,780
The URL can be used to link to this page
Your browser does not support the video tag.