My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2009-051
San-Marcos
>
City Clerk
>
02 Ordinances
>
2000 s
>
2009
>
Ord 2009-051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:55:06 AM
Creation date
9/10/2009 8:34:20 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Adopting
Number
2009-51
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water <br />0 Project Name (41) Victory Gardens W Ph I <br />Project Description <br />Replace failing mains in neighborhood between Willow Creek and the railroad tracks. <br />Project Name (42) Victory Gardens W Ph II <br />Project Description <br />Replace failing mains in neighborhood between Willow Creeak and IH35. <br />Project Name (43) W Distribution Imp <br />Project Description <br />On-going effort to replace repair and add water valves and hydrants throughout system, and <br />make emergency replacements <br />Project Name (44) W Pump Station Imp <br />Project Description <br />systematic repair, replacement and upgrade of water pump stations <br />Project Name (45) Wallace Addition Water <br />Project Description <br />• Replace undersized mains <br />Project Name (46) Water Master Plan <br />Project Description <br />Evaluate system needs and opportunities based on updated data and growth patterns. <br />Project Name (47) Water Supply <br />Project Description <br />Begin to acquire future water supplies through participation with Hays Caldwell Public Utility <br />Agency for Carrizo Wilcox aquifer water <br />Project Name (48) North Side Development (Phase 1) <br />Project Description <br />Earmark Project- Water related improvements for North Side Development at the Airport <br />Project Cost: $ 747,500 <br />Project Cost: $ 1,160,000 <br />Project Cost: $ 1,838,782 <br />Project Cost: $ 1,028,488 <br />Project Cost: $ 1,235,000 <br />Project Cost: $ 975,200 <br />Project Cost: $ 338,513 <br />Project Cost: $ 505,000 <br />0
The URL can be used to link to this page
Your browser does not support the video tag.