Laserfiche WebLink
Water <br />0 Project Name (41) Victory Gardens W Ph I <br />Project Description <br />Replace failing mains in neighborhood between Willow Creek and the railroad tracks. <br />Project Name (42) Victory Gardens W Ph II <br />Project Description <br />Replace failing mains in neighborhood between Willow Creeak and IH35. <br />Project Name (43) W Distribution Imp <br />Project Description <br />On-going effort to replace repair and add water valves and hydrants throughout system, and <br />make emergency replacements <br />Project Name (44) W Pump Station Imp <br />Project Description <br />systematic repair, replacement and upgrade of water pump stations <br />Project Name (45) Wallace Addition Water <br />Project Description <br />• Replace undersized mains <br />Project Name (46) Water Master Plan <br />Project Description <br />Evaluate system needs and opportunities based on updated data and growth patterns. <br />Project Name (47) Water Supply <br />Project Description <br />Begin to acquire future water supplies through participation with Hays Caldwell Public Utility <br />Agency for Carrizo Wilcox aquifer water <br />Project Name (48) North Side Development (Phase 1) <br />Project Description <br />Earmark Project- Water related improvements for North Side Development at the Airport <br />Project Cost: $ 747,500 <br />Project Cost: $ 1,160,000 <br />Project Cost: $ 1,838,782 <br />Project Cost: $ 1,028,488 <br />Project Cost: $ 1,235,000 <br />Project Cost: $ 975,200 <br />Project Cost: $ 338,513 <br />Project Cost: $ 505,000 <br />0