|
•
<br />Strpptc Summarv
<br />• •
<br />Project Category Prior Fundin 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
<br />
<br />(1) Loop 82 RR Overpass Post Realign GOrC or o Baod.tOthe, $ 880,000 $ 39,580,000
<br />(2) Bike Ped Improvements GO Bond. $ 1,185,000
<br />(3) Centerpoint Intersection Imp Coro eonde $ 30,475 $ 304,750
<br />(4) Comprehensive Plan Coro Bond, $ 103,500 $ 103,500
<br />(5) Craddock Extension C o10 Bona, $ 2,438,000
<br />(6) Donaldson Street Imp GOIC or o 13.m. $ 200,000 $ 43,800
<br />(7) Downtown Sidewalks Cor o Bond. $ 276,000 $ 2,530,000
<br />(8) Dunbar Street Recon C0 O RO-d, $ 6,817,551
<br />(9) FM 2439 Hunter Imp Other $ 6,400,000
<br />X70)
<br />X11)
<br />X12) Heritage Neighborhood St. Reconstruction GO Bond,
<br />IH 35 River Road Underpass C oro Bond,
<br />Leah Avenue Street Reconstruction GO Bond. $ 7,1DO,000
<br />$ 1,828,500
<br />$ 14,018,500
<br />
<br />$ 9,450,000
<br />X13) Misc Intersection Imp cor O BOna, $ 225,000
<br />(14) N LBJ Sessom to Holland C or O Bond. $ 2,500,000
<br />(15) Overlay District-Development Svs. Other $ 100,000
<br />(16) Railroad Quiet Zone Coro 8,,d,/Other $ 600,000 $ 1,000,000
<br />(17) Rio Vista Street Recon Cor o Band, 3,264,6401
<br />(18) River Ridge Ent Exit Ramps Cr O Bond.
<br />(19)
<br />(20)
<br />(21) River Ridge Ext to Post Rd Cr o Bond,
<br />River Ridge Extension to 21 Cr G Bona,
<br />River Road RR Overpass imp GOIC r O B.- U $ 895,965
<br />$ 4,510,300
<br />$ 30,000,000 $ 10,000,000
<br />$ 19,504,000
<br />(22) RR 12 Widen Hughson-Holland Cr o Bond. $ 345,000 $ 6,000,000
<br />(23) Sessom Reconstruction GO/C t O ROnd,rOther
<br />(24) SH 21 SM River Bridge cor O ROOd. $ 609,500 $ 1,828,500 $ 18,285,000
<br />(25) Sidewalks Along Chestnut Coto Bond.
<br />F $ 237,500
<br />(26) Thorpe Hopkins Imp GOIC of 0 Bond. $ 1,339,000 $ 2,100,000
<br />(27)
<br />(28)
<br />(29) Traffic Calming Cor o Bond.
<br />Transportation Imp Car O Bond.
<br />Traffic Signal Upgrade Cor O BOnd. $ 25,000
<br />$ 695,481 $ 28,750
<br />
<br />$ 287,500 $ 28,750
<br />$ 287,500 $287,500 $ 28,750
<br />$ 287,500 $ 28,750
<br />$ 287,50D $ 28,750
<br />$ 287,500 $ 28,750
<br />$ 287,500
<br />(30) Transportation Master Plan Coro S.M. $ 511,980 $ 487,600
<br />(31) Victory Gardens Street Recon GOIC or O eons. $ 1,874,000 $ 4,152,000
<br />(32)
<br />(33)
<br />(34) Wallace Addition Streets GO Bond.
<br />Yarrington Improvements Cor O Bond,10ther
<br />North Side Development (Phase 1) Other
<br />Total
<br />$ 10,600
<br />
<br />$ 18,578,471
<br />
<br />$ 285,000
<br />$ 48,725,050
<br />
<br />
<br />4,468,250
<br />
<br />
<br />-
<br />
<br />
<br />9,153,230 $ 3,169,400
<br />
<br />
<br />$ 39,750,415
<br />$ 1,400,000
<br />
<br />$ 47,280,801
<br />$ 1,250,000
<br />
<br />$ 5,253,725
<br />$ 14,000,000
<br />
<br />$ 47,412,100
<br />
<br />
<br />-
<br />
<br />
<br />9,450,000
|