My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-109
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2009 10:57:05 AM
Creation date
9/10/2009 8:42:35 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2009-109
Date
9/1/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
after a request is made. <br />1.4.11 Conduct monthly meetings with the City and other interested parties to review progress <br />on the Project. The Engineer will present a Project (working days) update, submittal log, RFI <br />log, Change and Field Order log. The Engineer will prepare meeting agendas for each meeting <br />and distribute meeting minutes within five calendar days of each meeting. <br />1.4.12 Not have control or charge of and will not be responsible for construction means, <br />methods, techniques, sequences or procedures, or for safety precautions and programs in <br />connection with the work, for the acts or omissions of the Contractor, subcontractors or any other <br />persons performing any of the work, or for the failure of any of them to carry out the work in <br />accordance with the construction contract documents unless such acts or omissions are due to the <br />negligence of the Engineer or are acts or omissions under the Engineer's control. However, <br />Engineer will exercise its authority on behalf of City in accordance herewith and particularly <br />during the construction phase so that all work performed by the Contractor results in a Project <br />completed in accordance with the construction contract documents, and during any phase should <br />the Engineer become aware of the Contractor's utilization of means, methods, techniques, <br />sequences and/or procedures of construction which, in Engineer's opinion, will not result in <br />completion of the Project in accordance with the construction contract documents; or which are <br />unsafe, Engineer will immediately inform the City and will take all necessary action which the <br />Engineer is authorized under this Agreement to take to correct the matter. <br />1.4.13 At all times have access to the work wherever it is in preparation or progress. <br />1.4.14 Determine the amounts owing to the Contractor based on its on-site professional <br />inspections and on evaluations of the Contractor's applications for payment including <br />comparisons of Contractor's monthly cost reports with its applications for payment, and will <br />make recommendations for payment in these amounts, as provided in the construction contract <br />documents, or take such other appropriate action which the Engineer deems necessary. <br />1.4.15 Make recommendations for payment that constitute a representation by Engineer to the <br />City, based on the Engineer's on-site inspections as provided in subsection 1.4.10 and on the <br />data comprising the Contractor's application for payment, that the work has progressed to the <br />point indicated; that, to the best of the Engineer's knowledge, information and belief, the quality <br />of the work is in acceptable conformance with the construction contract documents (subject to an <br />evaluation of the work for conformance with the construction contract documents upon <br />substantial completion, subject to the results of any subsequent tests required by or performed <br />under the construction contract documents, subject to minor variations from the construction <br />contract documents correctable prior to completion, and subject to any specific qualifications <br />stated in the Certificate for Payment); and that the Contractor is entitled to payment in the <br />amount certified. However, the issuance of a Certificate for Payment will not be a representation <br />that the Engineer has made any examination to ascertain how and for what purpose the <br />Contractor has used the monies paid by the City. <br />1.4.16 Have authority to reject work which does not conform to the construction contract <br />documents. Whenever, in the Engineer's reasonable opinion, it is necessary or advisable for the <br />M&S Agreement 2009 <br />9
The URL can be used to link to this page
Your browser does not support the video tag.