Laserfiche WebLink
b) One reproducible document in Word format and four copies of the completed final <br />Bid Items and Specifications; and <br />c) Provide a final cost estimate to the City in PDF and Word or Excel format. <br />d) Design plan view sheets, design standard details and design specifications at 100 % <br />complete. <br />e) All engineering documents, including all master CAD design files, sheet files, <br />calculation files (including hand calculations, spreadsheet calculations, drainage <br />input/output, quantities, etc) and any other engineering documentation related to the <br />project design, will be supplied in electronic format. <br />1.4 TASK 4 - BIDDING AND CONSTRUCTION ADMINISTRATION <br />The Construction phase for each Project will commence with either the award of a <br />construction contract to an outside contractor or will involve the performance of construction <br />acitivities by City crews. The Project will terminate when accepted by the City. The Engineer <br />will perform all or some of the services identified in this Section 1.4 dependent upon the method <br />of construction delivery for each Project assigned, as specifically authorized in the Work <br />Authorization Form. <br />Bidding <br />1.4.1 Assist the City in the distribution of the bid documents to prospective bidders and the <br />issuance of addenda (if any) following City's prior approval. <br />1.4.2 Assist the City in obtaining bids, tabulating bids, preparing bid tabulation forms, and in <br />awarding the contract for construction following the City's approval of the construction contract <br />documents and of the latest detailed final cost estimate of the Project. <br />1.4.3 Assist the City in the issuance of addenda (if any), and in conducting the pre-bid <br />conference with potential bidders. During the pre-bid conference, the Engineer will describe the <br />scope of work, answer pertinent questions of potential bidders and City staff, address requests for <br />additional information and make all necessary clarifications and interpretations of the <br />construction contract documents. <br />1.4.4 Assist the City in reviewing all bids, the Statement of Bidder's Qualifications, financial <br />statements of bidders, lists of bidders' proposed subcontractors, and all other documents required <br />to be submitted with the bids for responsiveness and for bid amount. Engineer will also verify <br />through reasonable investigation the financial and performance history documentation submitted <br />by the low bidder and second low bidder, and their references. The City will provide copies of <br />all of the bid documents to the Engineer within one day from the date of receipt of bids and the <br />Engineer will prepare a report of its review and evaluation, and include a written <br />recommendation for award within ten calendar days of receipt of the bid documents of the <br />contract for construction, or other action as may be appropriate. The City will make the final <br />decision on the award of the construction contract and the acceptance or rejection of bids. The <br />Engineer will provide technical (but not legal) advice in bid protest situations. It is assumed that <br />this Project will be bid as one Project and neither party anticipates that it will be necessary to re- <br />M&S Agreement 2009 <br />7