L .4an <br />GLA 2 <br />ENERGY. WATER - COMMUNITY SERVICES Attachment <br />Statement of Work for Engineering Services <br />Project Name: Rattler Low Side Addition Order No. Contract No. 4661 <br />■ Preliminary grading plan with erosion controls <br />■ Preliminary access road/entrance layout <br />■ Preliminary drainage plan with calculations <br />■ Preliminary substation fence/gates layout <br />■ PreIiminary property fence/gates layout <br />U. Electrical (60%) Review and Acceptance —the following minimum submittals are required <br />before proceeding with preparation of complete S/E package <br />■ 10% deliverables noted above <br />■ Project drawing list(s) <br />■ Partially completed material list (all major equipment and most, if not all, <br />remaining material identified) <br />■ Substation section views <br />■ Substation grounding details <br />■ Equipment vendor drawings <br />V. Structural (60%) Review and Acceptance — the following minimum submittals are required <br />before proceeding with preparation of complete S/E package (PDFs only) <br />■ Footing layout <br />■ Structural detail sheet(s) <br />■ Footing detail sheet(s) <br />■ Structural steel shipping list(s) <br />■ Rebar cutsheet(s) <br />W. Civil (60%) Review and Acceptance — the following minimum submittals are required before <br />proceeding with preparation of complete Civil package (PDFs only) <br />■ Boring Logs Sheet(s) <br />■ Access Road/Entrance Layout <br />■ Grading Plan <br />■ Drainage Plan with calculations <br />■ Substation Fence/Gates layout <br />■ Property Fence/Gates layout <br />X. Relay and Control (10%) Review and Acceptance—the following minimum submittals are <br />required before proceeding with preparation of complete R/C package <br />■ Detailed Construction Document <br />■ Relay one -lines <br />■ Control Enclosure Layout <br />■ AC/DC one -line <br />Y. Relay and Control (60%) Review and Acceptance — the following minimum submittals are <br />required before proceeding with preparation of complete R/C package <br />■ 10% deliverables noted above <br />■ Project drawing list(s) <br />■ Completed panel assembly drawings <br />■ Partially completed panel schematics (cable numbers can remain TBD at this <br />level) <br />■ Partially completed panel wiring diagrams (cable numbers can remain TBD at <br />this level) <br />Services Contract Page 3 of 9 Rev 7 02/19/2019 <br />Contract 9 4661 <br />