Laserfiche WebLink
CUSTOMER: The City of San Marcos <br />630 E. Hopkins <br />San Marcos, Tx 78666 <br />PROJECT: Rattler Substation Addition - SMEU Low -Side DATE SUBMITTED July 16, 2019 <br />Technical Services Agreement Date: N/A <br />SCOPE OF SERVICES: <br />LCRA shall secure Engineering Services for the SMEU portion of the Rattler Substation Addition project according to <br />the "LCRA Scope of Services" documented in Attachment 1 and "Statement of Work for Engineering Services" <br />documented in Attachment 2 attached hereto and incorporated herein. <br />SCHEDULE: <br />Begins: Services will commence within 10 days after receipt of a signed contract. <br />Completion: See Schedule in "Statement of Work for Engineering Services" Attachment 2 <br />ENGINEERING CONTRACT PRICE: <br />Estimated Cost: $950,000.00 <br />NOTE: Billing will be based on actual costs plus administrative adders ("Cost Plus" billing method). <br />This estimate is valid for 90 days from July 16, 2019. <br />Customer and the Lower Colorado River Authority agree that the work described above shall be performed in accordance with <br />the terms and conditions on the front and reverse sides of this form. <br />The Ci of n arco Lower Color do ver Authority <br />By: By: <br />Bertbreras Serg'o ar , E. <br />Title: City Manager Title: V.P., ransmrssion Design & Protection <br />Date: Date: ®R <br />OFFICE USE ONLY <br />Job Description: Eng. Services - Rattler Substation Addition <br />Account: ILCRA/TENCO/400302 Approved By: <br />LCRA Work Order: Completion Date: <br />