My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2019-161/approving an Engineering Services Contract with the Lower Colorado River Authority (LCRA) for provision of Engineering Services in connection with the design and construction of the Rattler Substation
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2019
>
Res 2019-161/approving an Engineering Services Contract with the Lower Colorado River Authority (LCRA) for provision of Engineering Services in connection with the design and construction of the Rattler Substation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 4:09:01 PM
Creation date
9/13/2019 1:47:07 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2019-161
Date
9/3/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENERGY -WATER -COMMUNITY SERVICES Attachment 2 <br />Statement of Work for Engineering Services <br />Project Name: Rattler Low Side Addition Order No. Contract No. 4661 <br />Representatives: <br />LCRA Project Manager <br />Brad Melnar <br />Engineering Manager <br />3505 Montopolis Drive, Austin, Texas 78744 <br />1-512-578-4518 <br />B rad.Melnar(ailcra.org <br />LCRA Project/Lead Engineer <br />Amanda Travieso, P.E. <br />Engineering Supervisor <br />3505 Montopolis Drive, Austin, Texas 78744 <br />1-512-578-4456 <br />Amanda. Travieso aa)-Icra.org <br />LCRA Lead Structural Engineer <br />Charles Wen, P.E. <br />Engineering Supervisor <br />3505 Montopolis Drive, Austin, Texas 78744 <br />1-512-578-4506 <br />Charles. Wen @1cra.org <br />LCRA Agent <br />Ashlee Nelson <br />Category Buyer <br />3700 Lake Austin Blvd, Austin, Texas 78703 <br />1-512-578-4186 <br />Ash] ee.Nelson(c ,,Icra.org <br />LCRA Project Inspector <br />Casey Neels <br />Engineering Analyst <br />3505 Montopolis Drive, Austin, Texas 78744 <br />1-512-578-4467 <br />Casey.Neels cr,lcra.org <br />Professional <br />Stanley Consultants, Inc. <br />Steve Holton <br />Business Development Manager <br />6836 Austin Center Blvd., Suite 350 <br />Austin, TX 78731 <br />512-427-3654 <br />holtonsteve2stanleygroup.com <br />1. Safety: <br />LCRA Transmission Services Corporation places no business objective or priority above safety. We require <br />safe designs in seeking engineering services. If, during the course of engineering design, you encounter <br />safety concerns, those concerns should be brought to our attention immediately. <br />2. Project Background: <br />This project consists of building a new substation for San Marcos Electric Utilities including grading, <br />ground grid, property acquisition, and fence. The project will also include the installation of one PWT and <br />associated switchgear. <br />Services Contract Pagel of9 Rev 7 02/19/2019 <br />Contract # 4661 <br />
The URL can be used to link to this page
Your browser does not support the video tag.